background image

p i c lt d .co m

9

 CAUTION! 

This meter is used to measure low energy high 

 voltage. The operator may be subject to electrical shock if the 

meter is not properly grounded and / or operated in accordance with 
instructions and procedures described within these operating 
instructions.

controls

POWER

On

Off

INPUT

Pulse

DC

Kilovolts

Pipeline Inspection Co.

testi ng i nstructions

Test the strength of the batteries by placing the power switch to the “ON” 

position. The display activating indicates the battery strength is good. If 
the display flickers or does not come on then replace both batteries as 
described on the battery instructions page. Place the power switch to the 

“OFF” position after testing is complete.

Summary of Contents for JeepMeter

Page 1: ...Spy Jeepmeter operating instructions PIPELINE INSPECTION COMPANY picltd com...

Page 2: ...work which supplies buildings used for domestic purpose is a registered trademark of Pipeline Inspection Company Houston Texas 77055 United States A copy of this Operating Instructions Manual can be d...

Page 3: ...ration 4 Principles of Operation 5 JeepMeter Overview 6 Battery Instructions 8 Controls Testing Instructions 9 JeepMeter Operation 10 Troubleshooting Guide 12 Technical Specifications 13 Maintenance R...

Page 4: ...usage Recalibration of our equipment should be performed ONLY at a SPY Authorized Service Center due to the unique calibration process test equipment utilized and properly trained SPY technicians We...

Page 5: ...JM enables the operator to measure DC up to 7 000 kV or pulse up to 35 kV Holiday detectors output both types of waveforms depending on the type of coating they are being used on For example the SPY...

Page 6: ...er provides the ultimate in accuracy and versatility It features a digital display of measured voltages The precision measurement displayed eliminates interpretation errors and is perfect for every da...

Page 7: ...Input Terminal 3 High Voltage Pulse Input Terminal 4 Quick Change Battery Compartments 5 Ground Input Terminal 6 Input Pulse DC Bat Switch 7 Output Voltage LCD Display Battery Indicator 8 Extendable F...

Page 8: ...ing the notch on the bottom of the battery compartment lift up and pull out to slide the battery trays out STEP 3 Insert two new 9 volt batteries into the battery trays and push the battery tray firml...

Page 9: ...operating instructions controls POWER On Off INPUT Pulse DC Kilovolts Pipeline Inspection Co testing instructions Test the strength of the batteries by placing the power switch to the ON position The...

Page 10: ...test lead to the pulse input terminal on the top center of the unit STEP 3 Connect the other end alligator clip of the red wire high voltage test lead to a holiday detector electrode or the metal por...

Page 11: ...6 Set the input switch to Pulse or DC position to match which input terminal is being used STEP 7 After and ONLY AFTER double checking that all the connections in Steps 1 through 6 are correct place...

Page 12: ...elected on the Pulse DC switch The 780 is DC The 785 and 790 are Pulse Wrong Connection High Voltage Pulse and DC Voltages have different circuitry to measure voltages and therefore must have differen...

Page 13: ...e Voltage Range 0 35 kV Pulse and 0 5 kV DC Measurement Accuracy 5 75 deg F Display Type LCD Battery Two 9 Volt Batteries Unit Weight w battery only 2 6 Unit Dimensions L x W x H 8 25 x 8 75 x 4 25 Fa...

Page 14: ...ned by anyone other than a SPY Authorized Service Center or SPY manufacturing facility In the event the unit fails to operate properly please return your unit to a SPY Authorized Service Center or SPY...

Page 15: ...for examination to establish buyer s claim Except with SPY s prior written approval SPY shall not be liable a for the cost of repairs alterations or replacements or any expense connected therewith ma...

Page 16: ...d com related equipment SPY MODEL PJM POCKET JEEPMETER SPY MODEL DCPJM DC POCKET JEEPMETER Please call our office at 713 681 5837 or email us at sales picltd com for more product details or to place a...

Page 17: ...picltd com 17 User notes...

Page 18: ...18 picltd com User notes...

Page 19: ...picltd com 19...

Page 20: ...PIPELINE INSPECTION COMPANY picltd com...

Reviews: