background image

p i c lt d .co m

15

Pipeline Inspection Company, hereafter referred to as (SPY

®

) warrants that 

SPY

®

 Model JM JeepMeter shall, under normal use and service, be free 

from defects in material and workmanship. SPY

®

‘s entire warranty obligation 

shall be limited to, at SPY

®

’s option, the repair or replacement free of charge 

to the buyer of any defective equipment or parts thereof which prove to be 
defective in material and workmanship under normal use and service.

Claims for defective parts must be made in writing within twelve (12) months 
after shipment of the equipment from the works of SPY

®

. Fast wearing and 

consumable parts including, but not limited to, electrodes and ground cables, 
are expressly excluded from the warranty. SPY

®

 shall have the option to 

require return of a claimed defective part to SPY

®

’s manufacturing facility in 

the U.S.A., freight prepaid by buyer for examination to establish buyer’s claim.

Except with SPY

®

’s prior written approval, SPY

®

 shall not be liable (a) for 

the cost of repairs, alterations or replacements or any expense connected 
therewith made or incurred by the buyer or its designers, or (b) for defects 
resulting from alterations or repairs made by others than SPY

®

‚ or its 

approved representatives.

SPY

®

 shall not be liable for damages, including but not limited to direct, special, 

indirect or consequential, resulting from the handling, or use, whether alone 

or in combination with other products, or any SPY

®

 equipment or third party 

designed or manufactured equipment, including without limitation, any loss 
or damage sustained or caused by the operation and use of the equipment 
which is improperly operated or its successful operation is impaired by 
natural elements after its delivery to the buyer.

The foregoing warranty is exclusive and in lieu of all other warranties 

whether written, oral or implied (including without limitation, any warranty 
of merchantability or fitness for purpose).

warranty

Summary of Contents for JeepMeter

Page 1: ...Spy Jeepmeter operating instructions PIPELINE INSPECTION COMPANY picltd com...

Page 2: ...work which supplies buildings used for domestic purpose is a registered trademark of Pipeline Inspection Company Houston Texas 77055 United States A copy of this Operating Instructions Manual can be d...

Page 3: ...ration 4 Principles of Operation 5 JeepMeter Overview 6 Battery Instructions 8 Controls Testing Instructions 9 JeepMeter Operation 10 Troubleshooting Guide 12 Technical Specifications 13 Maintenance R...

Page 4: ...usage Recalibration of our equipment should be performed ONLY at a SPY Authorized Service Center due to the unique calibration process test equipment utilized and properly trained SPY technicians We...

Page 5: ...JM enables the operator to measure DC up to 7 000 kV or pulse up to 35 kV Holiday detectors output both types of waveforms depending on the type of coating they are being used on For example the SPY...

Page 6: ...er provides the ultimate in accuracy and versatility It features a digital display of measured voltages The precision measurement displayed eliminates interpretation errors and is perfect for every da...

Page 7: ...Input Terminal 3 High Voltage Pulse Input Terminal 4 Quick Change Battery Compartments 5 Ground Input Terminal 6 Input Pulse DC Bat Switch 7 Output Voltage LCD Display Battery Indicator 8 Extendable F...

Page 8: ...ing the notch on the bottom of the battery compartment lift up and pull out to slide the battery trays out STEP 3 Insert two new 9 volt batteries into the battery trays and push the battery tray firml...

Page 9: ...operating instructions controls POWER On Off INPUT Pulse DC Kilovolts Pipeline Inspection Co testing instructions Test the strength of the batteries by placing the power switch to the ON position The...

Page 10: ...test lead to the pulse input terminal on the top center of the unit STEP 3 Connect the other end alligator clip of the red wire high voltage test lead to a holiday detector electrode or the metal por...

Page 11: ...6 Set the input switch to Pulse or DC position to match which input terminal is being used STEP 7 After and ONLY AFTER double checking that all the connections in Steps 1 through 6 are correct place...

Page 12: ...elected on the Pulse DC switch The 780 is DC The 785 and 790 are Pulse Wrong Connection High Voltage Pulse and DC Voltages have different circuitry to measure voltages and therefore must have differen...

Page 13: ...e Voltage Range 0 35 kV Pulse and 0 5 kV DC Measurement Accuracy 5 75 deg F Display Type LCD Battery Two 9 Volt Batteries Unit Weight w battery only 2 6 Unit Dimensions L x W x H 8 25 x 8 75 x 4 25 Fa...

Page 14: ...ned by anyone other than a SPY Authorized Service Center or SPY manufacturing facility In the event the unit fails to operate properly please return your unit to a SPY Authorized Service Center or SPY...

Page 15: ...for examination to establish buyer s claim Except with SPY s prior written approval SPY shall not be liable a for the cost of repairs alterations or replacements or any expense connected therewith ma...

Page 16: ...d com related equipment SPY MODEL PJM POCKET JEEPMETER SPY MODEL DCPJM DC POCKET JEEPMETER Please call our office at 713 681 5837 or email us at sales picltd com for more product details or to place a...

Page 17: ...picltd com 17 User notes...

Page 18: ...18 picltd com User notes...

Page 19: ...picltd com 19...

Page 20: ...PIPELINE INSPECTION COMPANY picltd com...

Reviews: