Engineering Data : Schematic

 

11

NOTE

Use this bulletin for preliminary layouts only

. Obtain current 

drawings from your Marley sales representative. All table data 

is per cell.

2  Last two characters of the model number indicate number of 

cells and cell configuration. 

3  Nominal tons are based upon 35°C HW, 29.5°C CW, 25.5°C 

WB and .68 m

3

/hr per ton. The Marley 

UPDATE

 web-based 

selection software provides MD model recommendations 

based on specific design requirements.

4  Standard overflow is a 3"

 

dia. M connection located on the 

side of the collection basin. Makeup water connection is 2"

 

dia. 

M connection located on the side of the tower. A 3" M drain 

connection is located on the side of the collection basin.

Model 

note 2

Nominal Tons 

note 3

Motor  

kW

dBA  

1.5m from air 

inlet face

Dimensions

Design 

Operating 

Weight 

kg

Shipping Weight 

kg

H

A

Weight/Cell

Heaviest 

Section

MD5010PAC1L

248

11

81

3412

2299

3883

2079

1052

MD5010PLC1L

249

11

80

MD5010QAC1L

269

15

81

MD5010QLC1L

270

15

80

MD5010RAC1L

286

18.5

81

MD5010RLC1L

289

18.5

80

MD5010PAD1L

279

11

81

3717

2604

4046

2242

1190

MD5010PLD1L

280

11

80

MD5010QAD1L

304

15

81

MD5010QLD1L

305

15

80

MD5010RAD1L

325

18.5

81

MD5010RLD1L

329

18.5

80

MD5010PAF1L

293

11

81

4021

2909

4234

2430

1353

MD5010PLF1L

294

11

80

MD5010QAF1L

317

15

81

MD5010QLF1L

318

15

80

MD5010RAF1L

341

18.5

81

MD5010RLF1L

346

18.5

80

MD5010SAF1L

360

22

81

MD5010SLF1L

362

22

81

MD5010 SINGLE CELL

Summary of Contents for Cooling Tower Marley MD

Page 1: ...Marley MD CoolingTower Engineering Data Specifications...

Page 2: ......

Page 3: ...r Distribution System 31 Casing and Fan Guard 31 Access 31 Collection Basin 32 Warranty 32 Specifications Options Stainless Steel Options Stainless Steel Collection Basin 33 All Stainless Steel Coolin...

Page 4: ...mill galvanized steel construction Factory assembled ensures final field installation will be hassle free Triple pass PVC inlet louvers limits splash out and eliminate sunlight from entering the colle...

Page 5: ...rs The left hand column of pages 28 through 39 provides appropriate text for the various specification paragraphs whereas the right hand Marley MD CoolingTower 5 column comments on the meaning of the...

Page 6: ...current drawing from your Marley sales representative The UPDATE web based selection software available at spxcooling com provides MD model recommendations based on customer s specific design require...

Page 7: ...drain connection is located on the side of the collection basin Model note 2 Nominal Tons note 3 Motor kW dBA 1 5m from air inlet face Dimensions Design Operating Weight kg Shipping Weight kg H A Weig...

Page 8: ...VATION 8 INLET C L 569 2578 2371 2794 140 MD5008 MULTICELL Use this data for preliminary layouts only Obtain current drawing from your Marley sales representative The UPDATE web based selection softwa...

Page 9: ...e of the tower A 3 M drain connection is located on the side of the collection basin Model note 2 Nominal Tons note 3 Motor kW dBA 1 5m from air inlet face Dimensions Design Operating Weight kg Shippi...

Page 10: ...SIDE ELEVATION END ELEVATION 569 2578 3651 140 Use this data for preliminary layouts only Obtain current drawing from your Marley sales representative The UPDATE web based selection software available...

Page 11: ...ion located on the side of the tower A 3 M drain connection is located on the side of the collection basin Model note 2 Nominal Tons note 3 Motor kW dBA 1 5m from air inlet face Dimensions Design Oper...

Page 12: ...IDE ELEVATION END ELEVATION 569 2578 3651 3715 140 Use this data for preliminary layouts only Obtain current drawing from your Marley sales representative The UPDATE web based selection software avail...

Page 13: ...ion is 2 dia M connection located on the side of the tower A 3 M drain connection is located on the side of the collection basin Model note 2 Nominal Tons note 3 Motor kW dBA 1 5m from air inlet face...

Page 14: ...LEVATION END ELEVATION 153 MD5016 SINGLE CELL Use this data for preliminary layouts only Obtain current drawing from your Marley sales representative The UPDATE web based selection software available...

Page 15: ...e collection basin Model note 2 Nominal Tons note 3 Motor kW dBA 1 5m from air inlet face Dimensions Design Operating Weight kg Shipping Weight kg H A Weight Cell Heaviest Section MD5016PAC1L 317 11 7...

Page 16: ...ELEVATION END ELEVATION 153 MD5016 TWO OR THREE CELL Use this data for preliminary layouts only Obtain current drawing from your Marley sales representative The UPDATE web based selection software ava...

Page 17: ...on the side of the collection basin Model note 2 Nominal Tons note 3 Motor kW dBA 1 5m from air inlet face Dimensions Design Operating Weight kg Shipping Weight kg H A Weight Cell Heaviest Section MD...

Page 18: ...ELEVATION END ELEVATION 153 MD5016 FOUR OR MORE CELLS Use this data for preliminary layouts only Obtain current drawing from your Marley sales representative The UPDATE web based selection software av...

Page 19: ...on the side of the collection basin Model note 2 Nominal Tons note 3 Motor kW dBA 1 5m from air inlet face Dimensions Design Operating Weight kg Shipping Weight kg H A Weight Cell Heaviest Section MD5...

Page 20: ...E ELEVATION END ELEVATION 153 MD5016 FOUR CELL QUAD Use this data for preliminary layouts only Obtain current drawing from your Marley sales representative The UPDATE web based selection software avai...

Page 21: ...ote 3 Motor kW dBA 1 5m from air inlet face Dimensions Design Operating Weight kg Shipping Weight kg H A Weight Cell Heaviest Section MD5016PAC4B 317 11 79 4801 3091 5933 3353 1710 MD5016PLC4B 320 11...

Page 22: ...Model Dimensions Design Operating Weight per cell kg Design Operating Load at support beam kg m W L C D E F MD5008__C 2578 2731 2537 2629 51 165 3072 563 MD5008__D 2578 2731 2537 2629 51 165 3197 586...

Page 23: ...etin for preliminary layouts only Obtain current drawings from your Marley sales representative for final design 2 Purchaser to provide tower support complete with holes and anchor bolts Do not use st...

Page 24: ...7 588 305 8 191 477 588 305 10 477 588 305 MD5016 6 477 639 331 8 191 477 639 331 10 216 477 639 331 12 477 639 331 Maximum m3 hr per Outlet Outlet Diameter Side or End Suction pump flow Sump pump flo...

Page 25: ...tect personnel and the equipment being hoisted 2 All hoisting equipment should be certified and comply with local and national safety regulations NOTE 3 Ensure that slings are of sufficient length so...

Page 26: ...al supply is 380 415 V 3ph 220 240V 1 ph available as extra cost option Heater has an integral thermostat set point nominally 3 C but adjustable to suit operating requirements Heater components are no...

Page 27: ...makeup water CAUTION The MD cooling tower must be located at such distance and direction to avoid the possibility of contaminated discharge air being drawn into building fresh air intake ducts The pur...

Page 28: ...base establishes the type configuration base materi al and physical limitations of the cooling tower to be quoted During the planning and layout stages of your project you will have focused your atten...

Page 29: ...ality and load carrying capabili ties into account in the selection of their materials of manufacture 6 0 Mechanical Equipment 6 1 Fan s shall be propeller type incorpo rating heavy aluminum alloy bla...

Page 30: ...an five 5 years following the date of tower shipment This warranty shall cover the fan speed reducer drive shaft and couplings and the mechanical equipment support The electric motor shall carry a man...

Page 31: ...nly over the fill The branch arms shall be corrosion resis tant PVC with polypropylene spray noz zles attached to the branch arms with a rubber socket connection for ease of removal and cleaning To en...

Page 32: ...provided in each cell of the tower The basin floor shall slope toward the drain to allow complete flush out of debris and silt which may accumu late Towers of more than one cell shall include steel fl...

Page 33: ...shall be fabricated of heavy gauge series 300 stainless steel Only low carbon stainless steel alloys will be accepted in order to minimize the risk of intergranular corrosion in the weld zones The to...

Page 34: ...ph in the Access section A welded aluminum safety cage shall surround the ladder extending from a point approximately 2m above the foot of the ladder to the top of the handrail Periodic inspection and...

Page 35: ...and remote temperature control devices The temperature controller shall be adjustable for the required cold water temperature If a thermostatic control ler is used it shall be mounted on the side of t...

Page 36: ...state PI temperature controller to adjust frequency output of the drive in response to the tower cold water temperature The temperature of the cold water and set point shall be displayed on the door o...

Page 37: ...motor speed The cooling tower manufacturer shall supply VFD start up assistance Tower vibration testing throughout the speed range is required to identify and lockout any natural frequency vibration...

Page 38: ...igid hot dip galvanized steel structural support that resists misalignment between the motor and sheaves pulleys For belt drive towers with motors inside the airstream motors shall be mounted on an ad...

Page 39: ...reas of the world but the need to avoid cycling may cause the cold water temperature to vary significantly Variable speed drives automatically minimize the tower s noise level during periods of reduce...

Page 40: ...8AB UNITED KINGDOM 44 0 1905 720 200 info uk spx com spxcooling com In the interest of technological progress all products are subject to design and or material change without notice 2008 SPX Cooling...

Reviews: