32
1.
Stretch two upper o
-
rings (1.5 X Ø16mm) over the
“
ears
”
of the upper link to prepare for installation:
N. Reinstalling the Rear Triangle
2.
Install the upper pivot axles through the bearings from the inboard sides of the link. Position the
pivot washers on the ends of them with the taper facing inward against the bearings. The two outer
surfaces of the pivot axles and the washers (red arrows) should be kept flush to ease rear triangle
engagement: