background image

● Connect AZ14 to AZ12 using 

L6 (2pcs).

● Connect AZ12 to AZ2 using 

L15 (4pcs) as shown in 

Figure 5.

Note: Make sure AZ12 and 

AZ2 are properly aligned.

● Connect the frames 

assembled in steps 3 and 5 

to form the playhouse from 

inside playhouse.

● Connect AZ5 to AZ1 using 

L11(4pcs).

● Connect AZ6 to AZ2 using 

L11(4pcs).

● Connect AZ11 to AZ1 using 

L6(4pcs) as shown in  

Figure 6.

Step 5

Step 6

Assembly Instructions

FIGURE 5

FIGURE 6

Inside view

Part No
AZ12
AZ14

Quantity

1

Part No
AZ11

Quantity

Hardware No 
L6
L11

Quantity

AZ11

Hardware No 
L15
L6

Quantity

2

9

AZ12

AZ14

AZ2

AZ12

AZ2

L15

AZ1

AZ6

AZ6

AZ5

AZ5

AZ2

AZ2

AZ1

L11

L11

L6

L6

AZ14

AZ12

Summary of Contents for PERSONALISED WOODEN PLAYHOUSE

Page 1: ...330 0904 420 Tips It will take 2 adults around 60 minutes to assemble Important Limit Age 3 10 years Maximum user 2 Warning Only for domestic use Warning Only for outdoor use PERSONALISED WOODEN PLAYH...

Page 2: ...Safety Information Parts Assembly Instructions Care and Maintenance 2 3 4 6 7 11 12 1...

Page 3: ...resulting in the bolt thread extending beyond the wood This poses a severe safety hazard If bolt threads protrude beyond the wood surface replace the bolt with a shorter one that will not protrude If...

Page 4: ...lling on sloping ground will put stress on all the joints which will cause the set to become loose and unstable Find a location where the equipment can be placed more than 2 meters from any structure...

Page 5: ...44 0330 0904 420 Please check you have all the parts listed below NO PICTURE QTY AZ1 1 AZ2 1 AZ3 1 AZ4 1 AZ5 2 AZ6 2 4...

Page 6: ...5 44 0330 0904 420 Please check you have all the parts listed below NO PICTURE QTY AZ7 2 AZ8 2 1 1 AZ9 AZ10 2 1 AZ11 1 AZ12 AZ13 AZ14 1...

Page 7: ...0330 0904 420 Please check you have all the parts listed below Phillips Head Screwdriver Phillips Head Screwdriver Electric Drill Working Gloves Ladder or Step Tool REQUIRED ASSEMBLY TOOLS NOT INCLUD...

Page 8: ...nect AZ3 to AZ4 using L11 3pcs as shown in Figure 2 Assembly Instructions Step 1 Step 2 FIGURE 1 FIGURE 2 X2 Part No AZ5 AZ6 Quantity 2 2 Hardware No L11 Quantity 6 Part No AZ3 AZ4 Quantity 1 1 Hardwa...

Page 9: ...ards Connect AZ10 to AZ1 and AZ2 using L4 3pcs Note Spacing between AZ1 to AZ2 should be 32 1cm as shown in Figure 4 Step 3 Step 4 Assembly Instructions FIGURE 3 FIGURE 4 FRONT BACK hole face upwards...

Page 10: ...inside playhouse Connect AZ5 to AZ1 using L11 4pcs Connect AZ6 to AZ2 using L11 4pcs Connect AZ11 to AZ1 using L6 4pcs as shown in Figure 6 Step 5 Step 6 Assembly Instructions FIGURE 5 FIGURE 6 Inside...

Page 11: ...re 7 Connect AZ9 to AZ5 and AZ6 using L5 4pcs as shown in Figure 8 Step 7 Step 8 Assembly Instructions FIGURE 7 FIGURE 8 Part No AZ7 Quantity 2 Hardware No L11 Quantity 4 Part No AZ9 Quantity 2 Hardwa...

Page 12: ...URE 9 FIGURE 10 Congratulations You have completed installing the playhouse Please go over the entire unit to tighten all the screws Make sure all parts are properly assembled before allowing children...

Page 13: ...against but not crushing the wood Over tightening hardware crushes wood fibers and can split wooden components resulting in the screw thread extending beyond the wood This poses a severe safety hazar...

Reviews: