Page 21
Deck Plan:
The deck(s) connect to the main upright posts according to the
specifications found on the Top Down View.
INSTRUCTIONS:
There are two methods:
The BEST method is to make a table or stand to place your
deck on at the required deck height. The table will stabilize the
deck so you can level it.
You can make a table from sawhorses.
Deck stand or table holds deck while you build around it.
Blocks stabilize the posts while table stabilizes the deck.
The second method is to pre-install the (4) deck clamps so that
there is 42 1/4” between the holes in the deck clamps.
Use a level and a marker to make sure the clamps are level to
each other.
Place deck onto clamps and bolt.
This method works but is less stable than the first method. The
deck and posts will stabilize more as you add components
Pre-install deck clamps and level.
SPECIFICATIONS:
Event: Steel Deck shall be constructed of #12 gage perforated
steel, welded to 2 1/2” x 2” by 18” angle frame, 1/4” endplates,
center-bracing, plastisol coated and oven cured.
Paint: Oven cured plastisol
Hardware: Stainless Steel tamper resistant
MAINTENANCE:
Touch up any marred paint surfaces.
Periodically check hardware for integrity and tightness.
Summary of Contents for Bobbie 911-124
Page 1: ...Page 1 800 727 8180 www sportsplayinc com 911 124 Model Bobbie...
Page 3: ...Page 3...
Page 13: ...Page 13 Footing Diagram...
Page 15: ...Page 15 Side view of installed post...
Page 25: ...Page 25...
Page 52: ...Page 52 1 2 4 3...
Page 53: ...Page 53 5 6 8 7...