511-108 Parallel Bars
Page
3 of 3
Rev 06/10/03
GENERAL ASSEMBLY INSTRUCTIONS:
Check all the parts and hardware with the packing list to be sure you have received
everything needed to assemble this product. CONTACT YOUR LOCAL DISTRIBUTOR WITH
NOTIFICATION OF ANY MISSING OR DAMAGED PARTS. Contact must be made within ten days of
receipt of your order.
Only hand-tighten nuts & bolts on initial assembly. Final tightening should be done
EVENLY after final assembly when unit has been plumbed & leveled.
After assembly is complete, ANY ENDS OF BOLTS PROTRUDING BEYOND NUTS SHOULD BE CUT OFF
AND/OR PEENED OVER TO REMOVE ANY SHARP EDGES. Go over entire unit to file smooth any
sharp edges or projections that may have been caused by rough handling in shipping or
installation. T-Clamps are designed for both one and two bolt connections. In many
situations only one bolt is required. See specific assembly instructions.
On products with platforms install 1 – 2 degrees off level to facilitate water drainage.
GENERAL MAINTENANCE INSTRUCTIONS:
Check MONTHLY for loose bolts, damaged or broken parts. Tighten and/or replace
immediately.
SPECIFIC ASSEMBLY INSTRUCTIONS:
STEP #1:
Mark & dig footing holes per SKETCH on PAGE #2.
STEP #2:
Stand up & brace in footing holes. Length of pipe legs below intended level
of resilient surfacing should be approximately 18” set so that top of
parallel bar is 3’6” high. Two long braces holding 2 legs each are
recommended.
STEP #3:
Plumb & level. Pour concrete and crown surface for drainage. Let stand 48
hours before removing braces, installing resilient surfacing and using
equipment.
STEP #4:
Attach Warning Label and Manufacturer’s Identification Label to a clean
surface. The labels should be attached in a location where they are clearly
visible and legible and away from normal hand and foot placement areas. The
labels must be replaced if they become illegible, destroyed or removed.
Contact your distributor for replacement labels.