511-103 Boarding Net
Page 4 of 4
rev: 05/25/2005
4. Assemble Net (103-141) to Net Bar Assembly with S-
Hooks (585-901) per Details C and D found on page 1.
Make sure ends of S-Hooks are closed.
5. Stand upright & brace in footing holes. Attach braces
to legs to hold proper height of top bar at 8’. Length of
pipe below intended level of resilient surfacing should
be approximately 24”
6. Plumb & level. Tighten all set screws using short
length of pipe with socket key to add leverage. Pour
concrete Let stand 48 hours before removing braces,
installing resilient surfacing and using equipment.
7. Attach Warning label and Manufacturer’s Identification
label to a clean surface out of the way of hand/foot
traffic. They should be attached I a location where they
are clearly visible and legible and away from normal
hand and foot placement areas. The labels must be
replaced if they become illegible, destroyed or
removed. Contact your distributor for replacement
labels.