511-103 Boarding Net
Page 3 of 3
rev: 05/25/2005
Use Area & Footing Layout:
General Assembly Instructions:
Check all parts and hardware with the parking list to be sure
you have received everything needed to assemble this product.
CONTACT YOUR DISTRIBUTOR WITH NOTIFICATION
OF ANY MISSING OR DAMAGED PARTS. Contact must
be made within ten days of receipt of your order.
Only hand-tighten nuts and bolts on initial assembly. Final
tightening should be done EVENLY after final assembly when
unit has been plumbed and leveled. After assembly is
complete, ANY ENDS OF BOLTS PRODRUDING BEYOND
NUTS SHOULD BE CUT OFF AND/OR PEENED OVER
TO REMOVE ANY SHARP EDGES. Go over entire unit to
file smooth any sharp edges or projections that may have been
caused by rough handling in shipping or installation. T-
Clamps are designed for both one and two bolt connections. In
many situations only one bolt is required. See specific
assembly instructions. On products with platforms, install 1-2
degrees off level to facilitate water drainage.
General Maintenance Instructions:
Check MONTHLY for loose bolts, damaged or broken parts.
Tighten and/or replace immediately.
Specific Instructions:
NOTE: All threaded ends of bolts protruding beyond nuts
must be cut off and/or peened to eliminate sharp edges. No
more than two threads should extend beyond face of nut.
1. Mark & dig footing holes per drawing found above/left.
2. Assemble on the ground. Attach elbows (503-501) to
each end of the Net Bar (103-202) per Detail A found
on page 1.
3. Attach posts (513-603) to each of the Elbows (503-501)
per Detail B found on page 1.