8
XE895
STEP ONE
HARDWARE FOR STEP 1
PART
TYPE
DESCRIPTION
QTY
137
BOLT
3/8”X2-1/4”
2
139
BOLT
3/8”X3-3/4”
4
176
FLAT WASHER
3/8”X19X1.5T
2
187
CURVED WASHER
3/8”X23X2T
4
1.
Gather
HARDWARE FOR STEP 1
.
2. Put the 2
FLAT WASHERS
(
176
) on the 2
HEX
HEAD BOLTS
(
137
) and hand-tighten them,
through the
TOP
of the
MIDDLE STABILIZER
TUBE
, into the
REAR RAIL ASSEMBLY
(
2
)
with the
WRENCH
(
194
).
3. Put 4
CURVED WASHERS
(
187
) on the 4
HEX
HEAD BOLTS
(
139
) and hand-tighten them
through the
FRONT
of the
MIDDLE STABILIZ-
ER TUBE,
into the
REAR RAIL ASSEMBLY
(
2
)
with the
WRENCH
(
194
).