IM-P204-03
CH Issue 8
24
4.5 Refitting of the spring and actuator assembly (continued)
6
Re-fit the pillar, washers and nuts. Use
a 19 mm A / F spanner to tighten the
nuts to a torque of 25 - 32 N m.
Pillar
Lower the actuator holder on to the
valve and locate the mounting holes.
5