SPELLMAN HIGH VOLTAGE
Installation 2
Installation and Operating Manual
– XRB011
Page 2-12
118149-001 REV F
2.3
OVERALL CONNECTIONS
NOTE: THIS IS BASIC CONNECTION ILLUSTRATION FOR TESTING. MORE COMPLEX AND
DEDICATED CIRCUITRY IS NEEDED IN ULTIMATE APPLICATION.
All cables should be routed away from the X-Ray port, and dressed and secured neatly in place. Cables
should be cut to the correct length if possible as excess cabling may contribute to EMI/RFI problems. For
those cables that cannot be cut to the correct length, try to minimize the area inside any loops of excess
cable, as these loops are in effect an antenna.
Figure 2-1: XRB011 I/O location
GND
RJ45