EPM/SMS MANUAL
3
118026-001 REV K
Chapter 2
Inspection and Installation
nitial inspection and preliminary checkout
procedures are recommended. For safe
operation, please follow the step-by-step
procedures described in Chapter 3, Operating
Instructions.
2.1 Initial Inspection
Inspect the package exterior for evidence of
damage due to handling in transit. Notify the
carrier and Spellman immediately if damage is
evident. Do not destroy or remove any of the
packing material used in a damaged shipment.
After unpacking, inspect the panel and chassis
for visible damage.
Fill out and mail the Warranty Registration card
accompanying the unit. Standard EPM/SMS high
voltage power supplies and components are
covered by warranty. Custom and special order
models (with an X suffix in the model number)
are also covered by warranty.
2.2 Mechanical Installation
The EPM/SMS series module power supplies are
designed for installation into existing or newly
developed OEM equipment. The power supply
can also easily fit into bench top applications or
test set requirements. Standard unit dimensions
are shown in Figure 2.1
For custom mounting requirements or specific
package size requirements consult Spellman’s
Sales Department. Spellman has many package
designs available, or can design a specific
enclosure for your requirements.
The
EPM/SMS
series
utilizes
solid
encapsulations for corona free operation. No
periodic maintenance is required. Lower voltage
units (under 6KV) utilize air insulation. Due to
conservative voltage spacing design, periodic
maintenance is not required
I