background image

11

10

Spectrum

TM

9. Cautions

1.  Without reading and understanding the contents of this user manual, DO NOT perform any operations on the 

control valve.

2.  Strictly prohibit a leaning position when shipping, installing and using this product as this could cause damage.

3.  During the regeneration, water from the tap will NOT be softened. It is NOT recommended to use water during 

regeneration; otherwise a negative effect on the regeneration result will occur.

4.  Initiate a regeneration cycle when the softener has been inactive for a long period of time and then turn on the 

tap for several minutes before resuming normal use.

5.  Do not disconnect power during service to prevent timer distribution.

6.  If water usage or hardness of raw water dramatically increases (compared to the normal usage), then the frequency 

of regeneration should increase.

7.  Hot water could cause severe damage to the softener system, for water boiler and water heaters users, ensure the 

total-run of the piping between the softener and the boiler is not less than 3 metres. It is recommended to install 

a check valve between the filter and the boiler if unable to meet the required piping length.

8.  The input water pressure must be between 2-8 bar.

9.  No chemicals should be present at the inlet and outlet connecting sectors.

10. Besides the system, spare part connection materials are not included in the scope of the manufacturer’s warranty.

11. The required environmental temperature for a softener is 1-42°C. Outside these parameters may cause the 

softener to malfunction.

12. Do not apply pressure to the softener.

13. Indoor installation is preferred. Avoid exposure to direct sunlight, radiation from other heating sources and avoid 

extreme weather conditions including rain and snow.

14. Use salt granules or tablets designed for softeners.

15. No tools should be used for connecting the plastic parts as over tightening or excessive force could result in 

damage.

16. If necessary use food grade silica sealant for lubricating rubber O-rings.

17. Only qualified personnel should adjust or remove the adaptor locking clips on the reverse of the valve, as this can 

tamper with the valve settings. Should this be required pressure must firstly be discharged from inside the water 

softener.

Summary of Contents for WTS-SOFT13

Page 1: ...ns p 3 3 Valve User Interface p 4 4 Installation Instructions p 5 5 Valve Initial Set up p 6 6 Valve Operation p 7 7 End User Instructions p 8 8 Troubleshooting p 9 9 Cautions p 11 10 Technical Information p 12 Spectrum TM Installation Service Operation Manual SoftH2 O FLO Water Softener ...

Page 2: ...ity m3 tH Valve Serial Number Inlet Water Hardness tH Resin Volume litres Treated Water Volume litres Outlet Water Hardness tH Volumetric m3 1 Backwash min 2 Brining Rinse min 3 Rapid Rinse min 4 Brine Tank Refill min Low Voltage DC Transformer or Battery 2 x 1 5V A 1 Description Equipment Adjustments ...

Page 3: ... the resin bed to remove the residual regenerant salt after the brining step until the water from outlet contains no regenerant rinse could also compact the resin bed for a better softening effect Refill Refill the brine tank with water to dissolve salt for the next regeneration Valve Operation Mode Softener Standard water softener operation Regeneration Mode Volumetric Water Hardness can be adjus...

Page 4: ... Valve User Interface Brine Line Drain Line Blending Valve Inlet Outlet Regeneration Indicator Parameter Display Flow Rate Indicator Regeneration Button R Next Button Up Button Down Button Time Display Cycle Nº Bypass ...

Page 5: ...2 Insert white brine tube inside the push fit valve connector Fig B 3 Close the stop cock 4 Connect the drain Line to the the outside drain of the premises It is necessary to fit an air gap device The drain piping should be as short as possible avoiding height of over 1 5 metres higher than the softener as well as lengths of over 5 metres 5 Connect the inlet and outlets to the fitted plumbing 6 Cl...

Page 6: ...button until the regeneration time is displayed VALUE H1 18 Using the UP or DOWN buttons set the time to a convenient one when you are less likely to use water i e 3 H1 3AM 19 Press NEXT button oF H2 will be displayed 20 Press NEXT button oF H3 will be displayed 21 Press NEXT button oF H4 will be displayed 22 Press the NEXT button so that a time will be displayed 23 Adjust to the correct rime of d...

Page 7: ...ed 6 3 Displaying the Remaining Volume of Water to be Treated Metered System Only Push the NEXT button to switch between the time of day and the remaining volume display 6 4 Initiate a Regeneration Push the regeneration R button for one second to initiate regeneration the system will regenerate immediately for a valve in immediate regeneration mode or at the next pre set time for a valve in delaye...

Page 8: ...ill be active again displaying the time of day By pressing NEXT you will display the amount of water left before the next regeneration is planned If the symbol Little circle with an arrow is flashing it indicates that your softener will regenerate at the programmed time Regeneration is a standard process required to recharge the resin contained inside the softener The regeneration will happen at t...

Page 9: ...ion 3 Re regeneration or use new resin G Softener fails to use salt 1 Water pressure is too low 2 Brine line blocked 3 Injector is blocked 4 Internal control leak 1 Line pressure must be at least 20 psi 2 Clean brine line 3 Clean or replace injector screen 4 Check piston seals and spacers H Brine container overflow 1 Refill time too long 1 Contact your supplier for assistance I Water hardness rema...

Page 10: ...the water supply 2 Iron build up in the system 3 Levels of iron too high in the feed water 1 Clean or replace the supply line to the system 2 Clean the valve and the resin bed 3 Increase backwash time to prevent fouling Specifically install an addi tional filter to remove iron D High levels of brine present in the brine tank 1 Clogged drain line 2 Defective cycle time 1 Check and clean the drain l...

Page 11: ...less than 3 metres It is recommended to install a check valve between the filter and the boiler if unable to meet the required piping length 8 The input water pressure must be between 2 8 bar 9 No chemicals should be present at the inlet and outlet connecting sectors 10 Besides the system spare part connection materials are not included in the scope of the manufacturer s warranty 11 The required e...

Page 12: ...rostatic Test Pressure bar 20 Max Flow Rate m3 hr 4 5 Inlet Outlet Pressure Tank Thread 2 5 Valve SPECTRUM 5 Power Requirements V 230 Salt Storage kg 10 14 21 Resin Volume l 13 18 25 Nominal Flow Rate m3 hr 0 5 0 6 1 Salt Consumption Per Regeneration kg 1 5 2 3 Water Consumption Per Regeneration l 78 90 133 Cabinet Width mm 330 Cabinet Depth mm 470 Cabinet Height mm 660 870 1100 ...

Reviews: