Spectrum Industries Freedom One eLift Lectern Owner'S Manual Download Page 6

0118408 Page 6 of 16

The audience-side panel can be removed to access the rear portion of the equip-

ment rack.
1. 

To remove the panel, gently pull the top of the panel and lift the panel 

out and away from the equipment rack.  

Figure 6

.

2.  To reattach, align the panel with the frame and snap into place.

•  Before moving, unplug and secure all power cords.

•  Close and lock doors.

• 

Remove any items from the top of the worksurface.

•  Unlock the casters.

• 

Push slowly and carefully.  Do not move over uneven or irregular surfaces.

•  Do not allow children to move.

•  Lock the casters after moving.

• 

Do not park unit in areas of heavy traffic.

• 

Do not run power cords across hallways, classrooms, or other areas 

where they will be walked on.

•  Do not leave unit unattended in areas where children have access.

•  Keep doors closed and locked whenever unit is unattended or parked.

•  Keep casters locked whenever the lectern is unattended.

Figure 7

Audience-side panel

Equipment Rack

   Audience-side

Actuator

Up / Down 

buttons

To wall outlet

Actuator

Note:

 The shroud panel can be 

removed with 2 screws and / 

or the worksurface extended to 

access internal wiring.

Wire Loom

Wiring Diagram

Figure 6

Control Box

Removing eq. rack audience-side panel

Moving and parking the lectern

Summary of Contents for Freedom One eLift Lectern

Page 1: ...ntactus Thank you for purchasing Spectrum products Lespi cesendommag espendantletransportdoiventfaire l objetd unrapportdansles5joursdeleurr ception Veuillez prendrecontactavecnoussidespi cesmanquento...

Page 2: ...tern 1 On a non abrasive surface carefully tip the equipment rack onto its back or side 2 Install the included stem casters or glides and tighten securely Note 2 locking casters should be installed on...

Page 3: ...quipment rack you want the shelf installed Left or right 2 Extend each shelf bracket by depressing the release lever and lifting until it locks into the 90 position Figure 4 1 3 Using a second person...

Page 4: ...e install the overbridge panel and secure with 2 1 4 20 x 35mm JC bolts Note Blank overbridge panels require the cus tomer to make necessary cutouts with a jigsaw or router This has a moderate difficu...

Page 5: ...t Overbridge Insert Panel Blank flat view Overbridge section view 2 grommet Max cutout area Cutouts should be avoided here if device will descend below worksurface Actuator plug below worksurface Work...

Page 6: ...ildren to move Lock the casters after moving Do not park unit in areas of heavy traffic Do not run power cords across hallways classrooms or other areas where they will be walked on Do not leave unit...

Page 7: ...g weight 27 lb 12 3 kg Unit to Unit Connector Kit 55359 For connecting equipment rack to lectern Simple installation lectern and equipment rack can remain right side up Shipping weight 9 lb 3 9 kg Cus...

Page 8: ...ceptacles 2 USB charge ports Aluminum housing and flange Thumbscrew clamps Requires worksurface cutout ETL certified Available in black silver or white Customer installed Equipment Rack for Freedom On...

Page 9: ...rotection Easy customer installation Battery Type Lithium ion Capacity 2 2 Ah 53 Wh Voltage nominal 24V Discharge current 9A max Max charging voltage 40V DC Charging current 0 5 A Certifications EN 62...

Page 10: ...utout to be made by customer UL certified Dual Flat Panel Monitor Arm 95533 Weight range 3 5 13 lb 1 6 5 9 kg per monitor Six mounting options clamp thru desk wall grommet hole side bolt reverse wall...

Page 11: ...witch Enhanced surge protection ETL listed UL listed 19 W 48 27 cm x 9 25 D 23 5 cm x 1 74 H 4 41 cm Shipping weight 8 7 lb 3 9 kg 16ga steel Drawer 15 97 W 40 56 cm x 14 56 D 36 98 cm x 3 H 7 63 cm W...

Page 12: ...o is responsible for the safety of these persons Moreover children must be under surveillance to ensure that they do not play with the product Misuse Do not overload the actuators this can cause dange...

Page 13: ...e g if the collision is with a soft object Misc on the DESKLINE DL5 DL6 system This system is a DESKLINE system developed for desks and for indoor use in offices Do not use it in industrial kitchens o...

Page 14: ...he power cord into a wall outlet 2 Make sure all lift mechanism wire connections are in place and secure 3 Remove anything located under the worksurface 4 Press and hold the Down button to lower the w...

Page 15: ...celui ci Si une maintenance est requise communiquer avec Spectrum Industries pour obtenir de l aide Consignes de s curit en lectricit Ne pas brancher le cordon d alimentation sur une rallonge V rifier...

Page 16: ...ber spectrumfurniture com register Learn more at Product Registration 1 800 235 1262 Toll free HELPLINE spectrum spectrumfurniture com Warranty We will make it right for you Thanks for choosing Spectr...

Reviews: