![Speck BADUJET Riva Operating Instructions Manual Download Page 51](http://html1.mh-extra.com/html/speck/badujet-riva/badujet-riva_operating-instructions-manual_1341722051.webp)
6
Start
Up
05/2013 VG
766.2330.061
EN
51
6 Start
Up
Allowing the pump to run dry will damage the unit!
Protection against Running Dry
Check the pump is always fully filled with water. Running the pump dry
can destroy the mechanical seals and plastic parts within seconds.
Never let the pump run dry not even when checking for the direction
of rotation.
Ventilate the pump and the suction line before starting up.
6.1 Filling
the
pump
1. Remove the cover. No tool is required to remove it.
When replacing the cover make sure that the key snaps snugly into
place over the position switch
Do not use force.
2. Using the hand pump included (attached to the base plate) ventilate
the unit as follows: See page 66, figure 11.
– Attach the tube of the hand pump to the air drain valve
on the
pump.
– Turn the air drain valve anti-clockwise to open.
– Pump until water flows out.
– Close the air drain valve clockwise and remove the hand pump.
– Replace the hand pump
The air regulation valve must be closed during aeration to prevent
any air being sucked in
3. Replace the cover.
Make sure that the position switch on the cover is seated correctly.
See page 61, figure 5.
Summary of Contents for BADUJET Riva
Page 34: ...10 Anlage I 34 DE VG 766 2330 061 05 2013 Abb 11 55 Abb 12 Abb 13 ...
Page 66: ...10 Appendix I 66 EN VG 766 2330 061 05 2013 fig 11 55 fig 12 fig 13 ...
Page 98: ...10 Annexe I 98 FR VG 766 2330 061 05 2013 OUVRIR FERMER Fig 11 55 Fig 12 Fig 13 ...
Page 130: ...10 Bijlage I 130 NL VG 766 2330 061 05 2013 OPEN DICHT afb 11 55 afb 12 afb 13 ...
Page 162: ...10 Impianto I 162 IT VG 766 2330 061 05 2013 APRIRE CHIUDERE Figura 11 55 Figura 12 Figura 13 ...
Page 227: ...10 Установка I 05 2013 VG 766 2330 061 RU 227 ОТКР ЗАКР Рис 11 55 Рис 12 Рис 13 ...