38
07.03.2014 TB-b bta badu jet smart_engl.indd
Final assembly of the BADU Jet smart unit
1) After installation of the jet housing:
2) Glue in the cable protection hose an the air line hose. (Fig. 1)
3) Place the complete nozzle housing (102.1) against the jet housing (1).
4) Slide pneumatic tube through protective conduit and seal up conduit with cable gland (20).
5) Attach air tubing with clip (8) to air control valve (21)
6) Fasten complete nozzle housing (102.1) with 4 self-tapping screws (95) on jet housing (1).
Attention: Tighten the self-tapping screws only by hand.
Do not use force.
7) Connect jet pump (92) with threaded half-union (98, 99, 100), rubber elbow (79) and the
pertaining hose clips (75) to the suction and pressure tubes of the jet housing.
8) Connect the pump motor as shown in the wiring diagram.
If a 3-phase AC supply is used, the correct sense of rotation must be ensured
.
9) The pump is switched on and off from the pool by means of pneumatic pushbutton (38/1).
10) The air control valve (21) can be used to inject air into the water jet, if desired.
ATTENTION:
The jet housing is made of ABS. If the suction and pressure
tubes are to be glued into the housing when the housing
is already in place, a minimum hardening time of 12 hours
must be observed.
BADU Jet smart jet housing as seen from behind
outlet connection
Inlet connection
Air control tube
Pneumatic switch
tube
bta badu jet smart_engl.indd 38
10.03.2014 09:31:02
Summary of Contents for BADU Jet Smart KH
Page 9: ...07 03 2014 TB b bta badu jet smart indd 9 bta badu jet smart indd 9 10 03 2014 09 46 50 ...
Page 10: ...10 07 03 2014 TB b bta badu jet smart indd bta badu jet smart indd 10 10 03 2014 09 46 50 ...
Page 11: ...07 03 2014 TB b bta badu jet smart indd 11 bta badu jet smart indd 11 10 03 2014 09 46 50 ...
Page 13: ...07 03 2014 TB b bta badu jet smart indd 13 bta badu jet smart indd 13 10 03 2014 09 46 51 ...