GB
GB
7
2. INSTALLATION
The installation must always be executed by a specialised company with
due consideration of the requirements cited below. For the installation of the
tiled stove tested in accordance with DIN EN 13229, the possibility exists
of installing downstream ceramic or metallic heating gas flues. If a closed
system is to be produced (hypocausts), the following must be ensured:
• Technically correct structure of the hypocausts.
• Configuration of the thermal insulation for components that require
protection.
• The insulation thicknesses specified in this manual meet requirements
specified in the standard DIN EN 13229 for a hot air system, i.e. with
supply air and recirculating air openings.
• For the installation of cables, fittings, control units or water-bearing
components, their max. ambient temperatures must not be exceeded.
• If front panels are to be installed, they must have rear ventilation on the
heating chamber side so that they are cooled and thus deformations
cannot occur.
For installation, connection and operation of the Nova F fireplace insert, all
necessary national and European standards, as well as local regulations
(DIN, DIN EN, state construction ordinances, firing ordinances, etc.) must be
complied with and applied!
HeizAnlV:
Heating Systems Ordinance
FeuVo:
(Firing Installation Ordinance) of the respective
German Federal State
1. BlmschV
First Ordinance on the Implementation of the Federal
Immission Control Act
EnEV
Energy Savings Ordinance
TR-OL
Regulations of the German Tiled Stove and Air
Heating Constructors Association (ZVSHK)
DIN 1298 / EN 1856 Connecting flue pipes for heat generating systems
DIN EN 13229
Inset appliances including open fires fired by solid
fuels
DIN EN 50165
Electrical equipment of non-electric appliances for
household and similar purposes - Safety requirements
DIN EN 13384
Chimneys - Thermal and fluid dynamic calculation
methods
DIN 18160-1/2
Chimneys / house chimneys
DIN EN 12828 /
Heating systems in buildings
DIN 4751
Design for water-based heating systems
LBO
State building code - appropriate state building code
This listing of directives makes no claim to be complete!
Attention: Plastic plugs are inserted in the fastening points for the carrying
aids (4x front 4x rear). After setup, these plastic plugs must be removed so
that they do not burn or vaporise at firing.
2.1 MINIMUM CROSS SECTIONS - CONVECTION AIR
The minimum cross sections for convection air (supply air and recirculating
air) in the cladding or in the heating chamber must be designed as follows.
Hot air: 2250 cm² at the upper points in the cladding
Cold air: 2100 cm² at the lower points in the cladding
The minimum cross section can be distributed over multiple openings.
EIn addition, the Regulations of the German Tiled Stove and Air Heating
Constructors Association (TR-OL 2006) must also be taken into account.
Summary of Contents for Nova F
Page 1: ...GB Installation and Operating Manual Nova F...
Page 17: ...GB GB GB 17 NOTES...
Page 18: ...GB 18 NOTES...
Page 19: ...GB GB GB 19...