background image

GB

GB

 15

•  the glass ceramics: Soiling caused by soot or burnt-in residues of burnt 

materials as well as visibly changed colour or other aspects due to ther-
mal stress.

•  Improper transport and/or incorrect storage
•  Improper handling of fragile components such as glass and ceramics
•  Improper handling and/or use
•  Lack of maintenance
•  Incorrect installation or connection of the unit
•  Non-observance of the installation and operating instructions
•  Technical modifications to the unit by third parties

8.6 DEFECT REMEDIATION/REPAIRS

Notwithstanding the statutory guarantee, which shall take precedence over 
our warranty during the statutory guarantee periods, within the scope of 
our warranty we will remedy free of charge all defects demonstrably due 
to a material fault or manufacturing error, provided that the other terms 
and conditions of this warranty undertaking are observed. In accordance 
with this warranty undertaking Spartherm Feuerungstechnik GmbH reserves 
the right either to rectify the defect or to replace the unit free of charge. 
Remediation of defects shall take precedence.

This warranty undertaking expressly does not cover further compensation 
exceeding the statutory guarantee.

8.7 EXTENSION OF WARRANTY

In the case of performance in accordance with the terms of the warranty, 
whether remediation of defects or replacement of a unit, the warranty period 
shall be extended in respect of the replacement unit/components.

8.8 SPARE PARTS

No spare parts other than those produced or recommended by the manu-
facturer shall be used. 

8.9 LIABILITY

Damage and compensation claims not based on a defective unit supplied 
by Spartherm Feuerungstechnik GmbH are excluded and are not covered by 
the warranty undertaking.
This does not apply to statutory warranty claims arising in a particular case.

8.10 NOTE

Your specialist dealer/contractor will gladly advise and assist you in matters 
not covered by our warranty terms and conditions and undertakings. We 
particularly advise you to have your fireplace insert/stove serviced regularly 
by a stove fitter.

Technical data subject to change. Errors and omissions excepted.

Summary of Contents for Nova F

Page 1: ...GB Installation and Operating Manual Nova F...

Page 2: ...ustomers emotions and speak to feelings such as security and comfort In order to be successful we recommend that you read these installation instructions care fully in order to quickly become thorough...

Page 3: ...llation of S Thermatik motor air box 9 2 5 Changing the door stop 9 2 6 Combustion chamber lining 11 3 Initial commissioning 12 4 Operation 12 6 Fuel 13 7 Rating plate 13 8 General warranty terms and...

Page 4: ...cified in this manual see technical data OUR HEATING INSERT HAS BEEN TESTED IN ACCORDANCE WITH DIN EN 13229 AND SATISFIES THE REQUIREMENTS STIPULATED IN THE CONSTRUCTION PRODUCTS DIRECTIVE DECLARATION...

Page 5: ...ear mm 100 Ceiling mm 160 Setup floor only under the metallic coasting temperature box mm 20 Necessary minimum distances to heating chamber components Convection chamber side rear to insert mm 100 Ins...

Page 6: ...GB 6 Fig 1b Nova F with front panel and external firing unit Fig 1a Nova F with wall penetrating element wall penetrating element wall penetrating element...

Page 7: ...the respective German Federal State 1 BlmschV First Ordinance on the Implementation of the Federal Immission Control Act EnEV Energy Savings Ordinance TR OL Regulations of the German Tiled Stove and A...

Page 8: ...ivery it may be necessary to mount the rotating disc through the combustion chamber in the floor area of the tiled stove e g device design with S Thermatik Installation is not executed in the factory...

Page 9: ...o produce the air connection the four hexagon socket screws must now be unscrewed Then the connecting lever must be lifted off the air adjustment lever With this step the entire air control unit is fr...

Page 10: ...opposite side where a bore is provided 3 Insertion of the new door Insert the new door to do this slide the door with the upper pivot hinge into the provided bores Then open the door 90 and fit the l...

Page 11: ...rough top side The front baffle plate 10 must be inserted in the same manner The combustion chamber lining is removed in the reverse sequence Important When removing and installing you must ensure th...

Page 12: ...e confirming proper installation and proper adjustment function of all control components and safety components must be given to the owner operator of the system Moreover the operator must be instruct...

Page 13: ...t make wood During the lifetime of the tree sunlight is chemi cally captured Solar energy is stored in lignin and cellulose When the wood is burned that energy is released again For further informatio...

Page 14: ...ty on elevating mechanisms operating devices such as handles adjustment levers shock absorbers electronic and electrical components such as exhausters gover nors original spare parts all purchased par...

Page 15: ...s the right either to rectify the defect or to replace the unit free of charge Remediation of defects shall take precedence This warranty undertaking expressly does not cover further compensation exce...

Page 16: ...for leaks yes no All safety devices thermal discharge safety device safety valve membrane expansion vessel checked yes no yes no Enter temperatures between insert and return flow boost Return flow te...

Page 17: ...GB GB GB 17 NOTES...

Page 18: ...GB 18 NOTES...

Page 19: ...GB GB GB 19...

Page 20: ...ndial para su sal n Het merk van wereldformaat voor uw woonkamer wiatowa marka do Pa stwa salonu 1 D Ihr Fachh ndler UK Your specialist dealer F Votre revendeur sp cialis IT Il vostro rivenditore spec...

Reviews: