NOTE: PIPE SECTIONS ARE FIELD SUPPLIED.
SEE NOTE
9
FIGURE 2.7: MOUNTING PLATFORMS FOR VERTICAL INSTALLATIONS
NOTICE: It is a requirement of the International
Mechanical Code (307.2.3) to install a secondary
drain or and auxiliary drain pan where damage to any
building components will occur as a result of over-
flow from the equipment drain pan or stoppage in the
condensate drain piping from a cooling or an evapo-
rator coil. Follow local code requirements.
Refer to Figure 2.2 for condensate drain location.
Components for the PVC condensate trap are provided in
a separate bag with fan coil unit (see Fig. 2.8) and should
be cemented together with PVC pipe cement.
Do not use substitute trap. Do not cut
off or alter trap components.
Screw male adapter (see Fig. 2.8) into unit condensate
line connection. Assemble and cement remaining com-
ponents together. Then cement assembly to male
adapter. The 45° elbow provides an offset from beneath
unit suction line for access to clean-out plug.
Run a condensate line from the trap to a suitable drain
that is in accordance with local codes. Make sure the line
is pitched
1
⁄
4
" per foot.
STEP 6: INSTALLING THE CONDENSATE TRAP & LINE
FIGURE 2.8: CONDENSATE TRAP ASSEMBLY
NOTICE: Never connect condensate line to a closed
drain system.