
Operating instructions UVR-300/UVR-400 | Heinz Soyer Bolzenschweißtechnik
45
Replacing the connection piece for the stud feed hose and rotating the stud retainer
(UVR-400 universal feeder)
Step 3:
Loosen the fastening screws (a) and remove the connection piece (b)
for the stud feed hose.
Step 4:
Pull out the stud retainer (a) and rotate the desired diameter to the
outlet rail (b).
To pull out and insert the stud retainer, use a screw or a stud
with diameter M10 which you screw into the centre (c).
Remove the screw/stud again after inserting the barrel.