
30
Operating instructions UVR-300/UVR-400 | Heinz Soyer Bolzenschweißtechnik
Connecting the universal feeder with the stud welding device (example BMS-9
Automatic)
Step 1:
Check that both devices are switched off.
Step 2:
Feeder connection
– interface
Connect the interface plug "Feeder" (a) from the feeder hose
package for the controls.
Please note: The CNC interface is not required/connected.
Step 3:
Feeder connection
– Supply air
Connect the supply air hose (a) from the feeder hose package.
Observe the maximum permitted pressure.
Step 4:
Feeder connection
– Blow air
Connect the blowing air line (a) from the feeder hose package.
Observe the maximum permitted pressure.
Observe the labelling on the connection and hose, do not mix up!
(B/blow air = silver hose)