INSTALLATION
1. Remove the wing nut,
washer and felt pad
3.Adjust the angle and
height of the rod then
tighten the wing nut.
1. Remove the wing nut,
washer and felt pad
2. Put the cymbal pad into the
rod, then attach parts re-
moved in the stet 1. Fasten
the wing nut but not too
tightly. It allows the pad a little
bit wobbling like real acous-
tic cymbal.
Note:
Crash and Ride has
different part number. Please
refer to indication in the page
2.
3.Adjust the angle of the rod then tighten the wing nut.
1. Insert the snare into
the snare installation L-
Rod, then tighten the
wing nut.
2. Put the Hi-Hat into the
rod, then attach parts re-
moved in the stet 1. Fas-
ten the wing nut.
2. Adjust the angle of
the L-Rod then tighten
the wing nut.
Hi-Hat Installation
Crash and Ride Installation
Snare Installation
1. Insert the tom into
the tom installation L-
Rod, then tighten the
wing nut.
Note:
All toms use the
same pad.
2. Adjust the angle of the L-Rod then
tighten the wing nut.
Tom Installation
1. Align holes in support and
stand then insert bolts and fasten
with attached key.
2. Insert tongue of the kick stand into
slot of the pedal . Tighten the wing
nut on the pedal level to fix it.
Kick Installation
COMPONENTS INSTALLATION
1. Align holes in supporting board and sound module then insert screws and
fasten it.
2. Insert rod of the supporting board to the clamp, then tighten the wing nut.
Sound module Installation
Please refer to the SOUND MODULE Chapter for electronic connection.
Electronic Connection
P-6C
Finalizing the Installation
After install all components, fine adjust the arm, clamps and rods to the best
positionyou like finally.
2
1
3
2
1
3
2
1
3
2
1
3
4