V1.22
Owners Manual SP20-Linex™
- 29 -
Step 5: Connecting enclosure fronts
Although a single person can set-up an entire rig of SP20-LINEX, the fastest setup is achieved by
two persons on either side of the array. At the front of the enclosure two fixed connecting bars
extend at the top. Remove the quick release pins at the front of the enclosure. Lift the front of the
suspended cluster towards the bottom cabinet of the array and slide the front connector
between the steel front rigging. The front connector easily slides into the rigging profile of the
cabinet in the array. Connect the cabinet fronts with the quick release pin.
Step 6: Setting angles at the back of the cabinet
Now the angle setting pin at the back of the cabinet can be set to the desired angle. While lifting
the cabinet back, remove the angle setting pin. Place the pin at the right hole and move the
cabinet back up or down to the correct angle. Once the corresponding holes are next to each
other push in and lock the angle setting pin.