Work Flow / Mount Control Panel on Unit
15
Cha
pte
r 2
P
rep
ar
at
ion
The steps that are required before starting to use
the SR-R4 are listed below.
When mounting Control Panel (SRK-CP1,
Option) on the unit
When mounting Control Panel (SRK-CP1,
Option) on the F65
Tip
A Phillips (cross head) screwdriver is required for
mounting the control panel.
Attach the CP bracket supplied with the Control
Panel (SRK-CP1, Option) to the unit, and connect
the unit and the control panel with the control
panel cable.
1
Attach the CP bracket supplied with the
control panel to the right side of the
unit.
2
Slide the control panel into the CP
bracket.
Chapter
2
Preparation
Work Flow
Mount control panel on unit
Turn power on
Insert SRMemory card
Mount control panel on the F65
Turn power on
Insert SRMemory card
Mount Control Panel on
Unit