3-1
FSV-VN7/CS7
Installation Space
Floor space of 1000 mm in front and 700 mm (
*
Min: 150 mm) behind the system is required for installa-
tion.
*
: When free space is less than 700 mm, move a rack to make a space for accesss when needed.
Procedure
This section describes the installation procedure of the HNF system.
n
Select an item from the index referring to the following flowchart, to see the details of each procedure.
Section 3
Installation Procedure
Start
3-1 Configuration
3-2 Setting
3-3 Library Configuration
3-4 System settings
3-5 Volume Registration
3-6 Final Verification
3-1-1 Prior to Connecting
3-1-2 Configuration
3-2-2 CSM-20 (SAIT Library)
3-2-3 Your PC for webmin Access
3-2-1 LIB-162 (AIT Library)
3-2-4 FSV-VN7 (Main Server)
3-3-1 Licence Registration
3-3-2 Verification of Library connection
3-4-1 Main Server time setting
3-4-2 NTP setting
3-4-3 Cache Server time settings
End
3-5-1 Start-up
3-5-2 Volume Registaration
3-5-3 Final Verification of Volume
3-6-1 Alert messages
3-6-2 Mount
3-6-3 Alert mail
3-2-5 FSV-CS7 (Cache Server)
3-6-5 Shutdown of the HNF System
3-6-6 Restart of the HNF System
3-6-4 Back-up and Restore to Tape and Cache Server