4-3
BFC-1
4-3.
INSTALLATION FLOWCHART
The installation procedure is shown in the following flowchart.
See each section about the detail.
START
4-1. PRECAUTION
4-2. PREPARATION
4-4. CONSOLE FIXING
4-5. VOLTAGE SELECTOR CHECK
4-6. CIRCUIT BRAKER CHECK
4-7. SWITCH ON CPU-107 BOARD SETTING
4-8. SWITCH ON IF-373 BOARD SETTING
4-9. SHIPPING PLATE REMOVAL
4-10. VTR/BIN UNIT
INSTALLATION
4-13. CABLE CONNECTION
4-14. CASSETTE LOADING AND REMOVAL
END
4-11. VTR/BIN UNIT
INSTALLATION
4-12. VTR/BIN UNIT
INSTALLATION, etc
BETACAM, S-VHS
DVCAM
D-2