DSC-WX50_L2
1-15
Side View
Eyepiece Side View
Eyepiece Side View
U Cutout
Convex
Part
qf
qg
qh
Ditches
Ditches
Gear
Ditches
Convex
Parts
Convex
Parts
Convex
Parts
qj
Main Assy (B)
Main Assy (B)
Number
Bump
Tube Lubricating
Block Assy
Tube Lubricating
Block Assy
Rotary Tube
Block Assy
Shield Ring (C)
Rotary Tube
Block Assy
Pet Side
Iris Flexible
Board
Put down the Shield Ring (C) into the Rotary Tube Block Assy.
Note:
Put down the Shield Ring (C) so that the pet side comes to the Eyepiece side.
Install the Tube Lubricating Block Assy while aligning the number on the Tube Lubricating Block Assy with the bump
on the Rotary Tube Block Assy
Turn the Tube Lubricating Block Assy to align the U cutout and the convex part of the Tube Lubricating Block Assy..
Align the end of the Iris Flexible Board with the gear of the Rotary Tube Block Assy as shown in the figure below,
and then install the Main Assy (B) while inserting the nine convex parts of the Main Assy (B) into the nine ditches
of the Tube Lubricating Block Assy.
Eyepiece Side View
qk
ql
w;
3 Group Spring
3 Group
Spring
3 Group
Spring
Front View
3 Group Frame
Block Assy
Iris Flexible Board
Cutout
Tube
Lubricating
Main Assy (A)
Main Assy (A)
Rear Mirror Plate
Ditches
Ditches
Ditches
Convex
Parts
Convex
Parts
Convex Parts
Install the Main Assy (A) while inserting the seven convex parts of the Main Assy (A) into the seven ditch
of the Rear Mirror Plate.
Turn the Tube Lubricating to the TELE state and insert the Iris Flexible Board into the cutout.
Install the 3 Group Frame Block Assy and then install the 3 Group spring.