4 | Mounting
14 / 40
Installation instructions sonnenBackup-Box
4 Mounting
4.1 Scope of delivery
Check the following scope of delivery to ensure it is complete.
1x
1x
1
9
8
4
1x
1x
5
2x
7
1x
2
3
6
2x
1x
1x
1
Backup-Box incl. internally pre-assembled lines (Battery lines, Control signal line)
2
Earthing line for connection to the storage system
3
Branch terminal
4
Cable entry plate, round
5
Blanking plug with membrane grommet
6
Battery line, red and black
7
Safety label
8
Installation instructions
9
Operating instructions
4.2 Additional parts required
The following components are not included in delivery and must be selected and
ordered by the qualified electrician accordingly:
2 x mains connection cable
(for
Connecting the mains cables [P. 24])
• Cable cross-section as per country-specific specification (at least 5G6mm²).
1 x earthing cable
(for Connecting earthing cables [P. 22])
• Cable cross-section: 10 mm
2
.
Optional:
Cable gland with multi-seal insert (see Routing cables into the storage system
[P. 26]).