SOLUXTEC USER GUIDE 2021_Version 1/a_ALL RIGHTS RESERVED 

PRECAUTION: 

Operate Solar PV modules in a safe environment. Suitable and exempt of any risks.

Maximum height to operate the modules is 4000 m above the sea level

Please do not use any abrasive or chemical solution on the modules. Neither on

 

glass nor on aluminium frames.

Avoid direct contact with salt water.

Solar PV modules are not to be considered as a roofing substitute. Solar PV modules

 

alone cannot grant waterproofing for the roof.

Roof waterproofing can be obtained considering the addition of a PV module and a

 

BIPV* solution.

*building integrated photovoltaic.

Operating temperature from -40°C to 85°C.

The best efficiency will be obtained by optimising the angle of inclination and facing

 

the sun.

When electing final position of the PV modules it is recommended to avoid any

 

potential shadowing that could result from building, chimney, trees and so on as it

 

could result in a significant energy loss.

SOLUXTEC’s PV modules can be installed only with mounting structures.

Mounting structures need to comply with any applicable laws specific to  the country

 

of installation.

Modules need to be installed on mounting structure following user guide

 developed 

by manufacturer of mounting structure

.

Respect a sufficient ventilation for the PV modules.

Respect mounting structure dilatation to avoid any extra mechanical stress on PV

 

modules.

Make sure to use a mounting structure material that won’t present any chemical

 

reaction on PV module frame (corrosion phenomena)

Clamp’s election is important and need to fulfill the minimum standards:

Frameless module clamps need an EPDM protection to tighten on glass.

For each type of Frameless modules, a minimal length of 120 mm is mandatory. 

For each type of framed modules, a minimal length of 80 mm clamps is

mandatory.

Clamps are not in contact with front glass, or clamps for frameless modules

are not shadowing solar cells.

A minimum of 4 clamps/module is mandatory.

Tightening force in Newton must follow recommendation of the clamp

producer.

Summary of Contents for DMMVI370

Page 1: ...USER GUIDE SOLUXTEC SOLAR PRODUCTS...

Page 2: ...TION 3 2 BASIC SAFETY INSTRUCTIONS 3 3 REGULATION 4 4 TRANSPORTATION AND HANDLING 4 5 PRODUCT DETAILS 5 6 INSTALLATION 6 Modules Design 6 Precaution 8 Installation Option 10 7 ELECTRICAL INSTALLATION...

Page 3: ...of installation It is imperative to refer to the standards of each local authority in case specifics rules are imposed Installation of photovoltaic modules must be operated by qualified people with su...

Page 4: ...m number of pallets to be stacked Only original SOLUXTEC packaging is allowed for pallet stacking When unpacking modules please wear soft and clean gloves It is forbidden to use suction cup to carry t...

Page 5: ...e of production Commercial name STC standard test condition data Pmpp Power in watt at maximum power point Isc Short circuit Intensity in ampere Impp Intensity in ampere at power point Voc Voltage in...

Page 6: ...wing guidelines need to be respected on site MODULE DESIGN PRESENTATION Frame design for M6 solar cells modules DMMVI DMMVI_GEMINI DMMVIPG Frame design for M10 solar cells modules DMMX DMMXPG 1038 mm...

Page 7: ...ign for Poly and Mono M3 solar cells modules DMP DMM Frameless Design for M6 solar cells Module Glass Foil Glass Glass PSMVI total thickness of 5 5 mm PSMVIPG total thickness of 6 5 mm 1005 mm 1665 mm...

Page 8: ...could result in a significant energy loss SOLUXTEC s PV modules can be installed only with mounting structures Mounting structures need to comply with any applicable laws specific to the country of in...

Page 9: ...ame flange For module series equipped with a water drain corner clamp must not be applied directly on Please refer to the table on next page showing the different installation options from SOLUXTEC s...

Page 10: ...afety factor of 1 5 With Clamps DMP DMM DMMIV DMMX DMMIVPG DMMXPG PSMVI PSMVIPG Test 8100 2400 Design 5400 1600 Test 2400 2400 Design 1600 1600 Test 8100 2400 Design 5400 1600 Test 2400 2400 Design 16...

Page 11: ...With Mounting Holes DMP DMM DMMIV DMMX DMMIVPG DMMXPG DMMIV DMMX DMMIVPG DMMXPG GEMINI Test 8100 2400 Design 5400 1600 Test 8100 2400 Design 5400 1600 Test 2400 2400 Design 1600 1600 Y 410 X 200 X 50...

Page 12: ...solution supplier for the set PV module mounting system clamp system All accessories such as bolt screws and other metal parts are corrosion proof and exempt of any chemical reaction with the frame of...

Page 13: ...in a good shape The final wiring conception is determined in relation to the final project on site Modules deployed for a given project should present the same technical characteristics to prevent an...

Page 14: ...e need to consider the voltage open circuit and the minimal temperature on site You can calculate it with the following formula 1 25 Where N number of modules in serial Uoc Open circuit voltage of a m...

Page 15: ...a fire departure This point is extremely important All framed modules need to be connected together with a grounding solution to the main equipotential bonding of the project location On each module...

Page 16: ...company having realised the installation in order to control the efficiency of the complete generator Dust or pollution from the environment may gather on the surface of PV modules Hence it is recomme...

Page 17: ...17 SOLUXTEC USER GUIDE 2021_Version 1 a_ALL RIGHTS RESERVED SOLUXTEC GmbH Werner von Siemens Str 25 D 54634 Deutschland HRB Wittlich 41318 info soluxtec de...

Reviews: