Connectors need to be kept dry and clean. When wiring connectors together, make
sure that both are from same manufacturer and same reference.
When well connected, you must listen a “click” confirming the right connection.
A bad connection may result into arcs and electrical shock. Arcs may also be the origin
of a fire departure. This point is extremely important.
All framed modules need to be connected together with a grounding solution to the
main equipotential bonding of the project location.
On each module, you can find 4 different location allowing the grounding bonding and
mark with this logo:
It is recommended to use a 10 mm² bonding connector to realize the grounding
between each module. The recommended section to the main equipotential bonding
is 16 mm².
The legal standard from the installation place might be different and need to be follow
in priority.