SOLUXTEC USER GUIDE 2021_Version 1/a_ALL RIGHTS RESERVED 

3

 

REGULATION 

 

All modules presented in this document are covered by the following standards: 

 

IEC 61215 

 

IEC 61730  

 

IEC 62804 (PID) 

 

IEC 61701 (SALT MIST) 

 

IEC 62716 (AMMONIA) 

 

EMC and Low Voltage regulation 

 

NOTE: SOLUXTEC is always improving its products. Please contact  customer service if a 

standard is missing for your project from the above list. 

 

 

TRANSPORTATION AND HANDLING 

 

During transportation and interim storage, following points have to be respected: 

 

 

Transportation of the modules needs  to be done only with  SOLUXTEC original 

packaging. 

 

 

Never exceed the maximum number of pallets to be stacked. Only original SOLUXTEC 

packaging is allowed for pallet stacking. 

 

 

When unpacking modules, please wear soft and clean gloves. It is forbidden to use 

suction cup to carry the module as it will damage the ento reflective coating for the solar 

glass. 

 

 

It is forbidden to carry/lift the modules from the solar cables or from the junction box or 

any conductive elements. 

 

 

Do not drop module directly on module. 

 

 

While handling modules be cautious, especially on the corners to not shock them. 

 

 

While handling the modules never scratch the anodised coating of the frame.  

Corrosion may occur and cause mechanical resistance diminution. 

 

 

It is forbidden to drill holes in the aluminium frames.  

 

 

It is forbidden to paint the modules or to apply any adhesive on the module’s surface. 

 

 

Never walk on the module. 

 

Summary of Contents for DMMVI370

Page 1: ...USER GUIDE SOLUXTEC SOLAR PRODUCTS...

Page 2: ...TION 3 2 BASIC SAFETY INSTRUCTIONS 3 3 REGULATION 4 4 TRANSPORTATION AND HANDLING 4 5 PRODUCT DETAILS 5 6 INSTALLATION 6 Modules Design 6 Precaution 8 Installation Option 10 7 ELECTRICAL INSTALLATION...

Page 3: ...of installation It is imperative to refer to the standards of each local authority in case specifics rules are imposed Installation of photovoltaic modules must be operated by qualified people with su...

Page 4: ...m number of pallets to be stacked Only original SOLUXTEC packaging is allowed for pallet stacking When unpacking modules please wear soft and clean gloves It is forbidden to use suction cup to carry t...

Page 5: ...e of production Commercial name STC standard test condition data Pmpp Power in watt at maximum power point Isc Short circuit Intensity in ampere Impp Intensity in ampere at power point Voc Voltage in...

Page 6: ...wing guidelines need to be respected on site MODULE DESIGN PRESENTATION Frame design for M6 solar cells modules DMMVI DMMVI_GEMINI DMMVIPG Frame design for M10 solar cells modules DMMX DMMXPG 1038 mm...

Page 7: ...ign for Poly and Mono M3 solar cells modules DMP DMM Frameless Design for M6 solar cells Module Glass Foil Glass Glass PSMVI total thickness of 5 5 mm PSMVIPG total thickness of 6 5 mm 1005 mm 1665 mm...

Page 8: ...could result in a significant energy loss SOLUXTEC s PV modules can be installed only with mounting structures Mounting structures need to comply with any applicable laws specific to the country of in...

Page 9: ...ame flange For module series equipped with a water drain corner clamp must not be applied directly on Please refer to the table on next page showing the different installation options from SOLUXTEC s...

Page 10: ...afety factor of 1 5 With Clamps DMP DMM DMMIV DMMX DMMIVPG DMMXPG PSMVI PSMVIPG Test 8100 2400 Design 5400 1600 Test 2400 2400 Design 1600 1600 Test 8100 2400 Design 5400 1600 Test 2400 2400 Design 16...

Page 11: ...With Mounting Holes DMP DMM DMMIV DMMX DMMIVPG DMMXPG DMMIV DMMX DMMIVPG DMMXPG GEMINI Test 8100 2400 Design 5400 1600 Test 8100 2400 Design 5400 1600 Test 2400 2400 Design 1600 1600 Y 410 X 200 X 50...

Page 12: ...solution supplier for the set PV module mounting system clamp system All accessories such as bolt screws and other metal parts are corrosion proof and exempt of any chemical reaction with the frame of...

Page 13: ...in a good shape The final wiring conception is determined in relation to the final project on site Modules deployed for a given project should present the same technical characteristics to prevent an...

Page 14: ...e need to consider the voltage open circuit and the minimal temperature on site You can calculate it with the following formula 1 25 Where N number of modules in serial Uoc Open circuit voltage of a m...

Page 15: ...a fire departure This point is extremely important All framed modules need to be connected together with a grounding solution to the main equipotential bonding of the project location On each module...

Page 16: ...company having realised the installation in order to control the efficiency of the complete generator Dust or pollution from the environment may gather on the surface of PV modules Hence it is recomme...

Page 17: ...17 SOLUXTEC USER GUIDE 2021_Version 1 a_ALL RIGHTS RESERVED SOLUXTEC GmbH Werner von Siemens Str 25 D 54634 Deutschland HRB Wittlich 41318 info soluxtec de...