7.2 Mechanical check
Carry out the main mechanical checks to ensure the inverter is
waterproof as follows:
1. Make sure the inverter has been correctly mounted with wall
bracket.
2. Make sure the cover has been correctly mounted.
3. Make sure the communication cable and AC connector have
been correctly wired and tightened.
7.3 Safety code check
Choose suitable safety code according to the location of
installation. please visit website (https://solplanet.net/installer-
area/#monitoring) and download the AISWEI Cloud APP manual
for detailed information, you can find the Safety Code Setting
Guide in an event where an installer needs to set the country
code manually.
The Solplanet’s inverters comply with local safety code when
leaving the factory.
7.4 Start-up
After finishing the electrical and mechanical checks, switch on
the miniature circuit-breaker and DC-switch in turn. Once the DC
input voltage is sufficiently high and the grid-connection
conditions are met, the inverter will start operation automatically.
Usually, there are three states during operation: