User Manual UM0025_ASW3000-6000H-S2_EN_V02_0722                                                            57 

Waiting: 

when the inverter does not meet the requirements of 

each mode 

(

When the initial voltage of the strings is greater than 

the minimum DC input voltage but lower than the start-up DC 

input voltage, battery voltage lower than the start-up battery input 

voltage or BMS communication not connect) the inverter is 

waiting for sufficient DC input voltage and cannot feed power into 

the grid. 

 

Checking: 

When the inverter meets the start-up conditions of 

each mode. the inverter will check feeding conditions at once. If 

there is anything wrong during checking, the inverter will switch 
to the “Fault” mode. 

 

Normal: 

After checki

ng, the inverter will switch to “Normal” state 

and feed power into the grid. 

During periods of low radiation, the inverter may continuously 

start up and shut down. This is due to insufficient power 

generated by the PV array.   

If this fault occurs often, please call service. 

 

 

 

 

 

 

 

If the inverter is in "Fault" mode, refer to Section 11 
"

Troubleshooting

". 

Summary of Contents for ASW H-S2 Series

Page 1: ......

Page 2: ...se 8 2 2 Important safety information 9 2 3 Symbols on the label 11 3 Unpacking 13 3 1 Scope of delivery 13 3 2 Checking for transport damage 14 4 Mounting 15 4 1 Requirements for mounting 15 4 2 Moun...

Page 3: ...Requirements for the DC Connection 38 6 7 2 Assembling the DC connectors 39 6 7 3 Connecting the PV array 41 6 8 Battery connection 42 6 9 Communication equipment connection 44 6 9 1 Communication 45...

Page 4: ...chnical Data 63 11 1 DC input data 63 11 2 Battery input data 64 11 3 Grid AC output data 65 11 4 Grid AC intput data 66 11 5 EPS output data 67 11 6 General data 68 11 7Safety regulations 69 11 8 Eff...

Page 5: ...creased ambient temperature ASW6000H S2 77 11 10 Tools and torque 78 12 Troubleshooting 80 13 Maintenance 83 13 1 Cleaning the contacts of the DC switch 83 13 2 Cleaning the heat sink 83 14 Recycling...

Page 6: ...ill be supported in priority by the system then battery power exceed consumption power will be drained from grid inverter It can provide power for emergency use during the grid lost by using the energ...

Page 7: ...n personnel should also be familiar with local requirements rules and regulations Qualified persons must have the following skills Knowledge of how an inverter works and is operated Training in how to...

Page 8: ...will result in death or serious injury WARNING indicates a hazardous situation which if not be avoided can result in death or serious injury CAUTION indicates a hazardous situation which if not be avo...

Page 9: ...t the values comply with the permitted operating range of all components at all times 6 Battery negative BAT on inveter side is not grounded as default design Connecting BAT to EARTH are strictly forb...

Page 10: ...is present in the DC conductors and the live components of the inverter Touching the DC conductors or the live components can lead to lethal electric shocks If you disconnect the DC connectors from th...

Page 11: ...er resulting in burns or a fire hazard when they are short circuited or wrongly installed Do not wear watches rings or similar metallic items during battery replacement Use insulated tools Put on rubb...

Page 12: ...carried out by skilled and authorized electricians Beware of hot surfaces The inverter can get hot during operation Avoid contact during operation WEEE designation Do not dispose of the product togeth...

Page 13: ...s discharge Before opening the covers the inverter must be disconnected from the grid and PV array Wait at least 5 minutes to allow the energy storage capacitors to fully discharge Observe the documen...

Page 14: ...B Wall mounting bracket 1 piece C Screw accessory 1 set D Documentation 1 set E DC connector 2 pairs F WiFi stick 1 piece G Battery terminal cover 1 set H AC connector 2 pieces I Smart meter 1 piece...

Page 15: ...king for transport damage Thoroughly inspect the packaging upon delivery If you detect any damage to the packaging which indicates the inverter may have been damaged inform the responsible shipping co...

Page 16: ...erature of the inverter should be 45 C 4 To avoid direct sunlight rain snow ponding on the inverter it is suggested to mount the inverter in places with a top protective roof Do not completely cover t...

Page 17: ...tilted backwards Max 15 It is not recommended to install the inverter on the wall made of plasterboards or similar materials The inverter may make noise when working 6 To ensure adequate heat dissipa...

Page 18: ...dropped The weight of Solplanet inverter is max 21 5 kg There is risk of injury if the inverter is lifted incorrectly or dropped while being transported or when attaching it to or removing it from th...

Page 19: ...to the wall mounting bracket on both sides using M5 screws Screwdriver type PH2 torque 2 5Nm 4 To protect the inverter from theft attach the padlock provided by customer through the wall mounting bra...

Page 20: ...hybrid inverter applicable to on grid PV systems and also backup mode With the integrated Energy Management System EMS they can control and optimize the energy flow in order to increase the self consu...

Page 21: ...blic power grid F Back up load Uninterrupted power equipment G Normal load General electrical equipment H APP Inverter setting and display 5 2 System wiring diagram Australia PV1 INVETER PV1 PV2 PV1 P...

Page 22: ...nverter Self Consumption Backup Force time use Custom Off grid If mode switching is in operation please stop the inverter first 5 3 1 Self Consumption The photovoltaic energy is preferentially used by...

Page 23: ...When the load power is too large first from the photovoltaic energy and then battery discharge and finally consume the power from the grid 1 In the morning the photovoltaic energy is insufficient and...

Page 24: ...y as a backup power supply always keep sufficient energy power supply to the load when GRID failure Load priority battery load GRID When the photovoltaic energy is enough first charge the battery then...

Page 25: ...event of GRID failure as a backup power supply to the load 1 Photovoltaic priority to charge the battery 2 Under normal conditions the battery does not discharge Even at night 3 When there is a GRID f...

Page 26: ...Users can manage the energy according to their own needs and set the daily regular charging and discharging on the app Other time follow the Self Consumption mode 5 3 4 Off GRID The inverter operates...

Page 27: ...on insulated cable ends Do not touch the DC conductors Do not touch any live components of the inverter Have the inverter mounted installed and commissioned only by qualified persons with the appropri...

Page 28: ...the PV array plus a safety reserve of 20 Install a DC switch to each PV string to isolate the DC side of the inverter We recommend the following electrical connection DC BOX optional AC BOX DC INPUT A...

Page 29: ...S communication port E METER Merter communication port F DRED DRMs device port G COM1 Wi Fi Stick port H EPS connector I Additional grounding screw J AC connector 6 4 AC connection Danger to life due...

Page 30: ...0H S2 6000H S2 Object Description Value A External diameter 10 to 16 mm B Conductor cross section 4 to 6 mm C Stripping length of the insulated conductors approx 13 mm D Stripping length of the outer...

Page 31: ...110 m 89 m 67 m 42 m 20m The required conductor cross section depends on the inverter rating ambient temperature routing method cable type cable losses applicable installation requirements of the cou...

Page 32: ...No consumer load should be applied between AC circuit breaker and the inverter The selection of the AC circuit breaker rating depends on the wiring design wire cross section area cable type wiring me...

Page 33: ...when the grounding conductor monitoring is deactivated In order to guarantee safety in accordance with IEC 62109 when the grounding conductor monitoring is deactivated carry out one of the following...

Page 34: ...hread the swivel nut and threaded sleeve over the AC cable Danger to life due to high voltages in the inverter Touching the live components can lead to lethal electric shocks Before performing the ele...

Page 35: ...terminals and tighten the screw with a accompanied Torx screwdriver TX 8 torque 1 4Nm Ensure that all conductors are securely in place in the screw terminals on the bush insert Assemble the locking ca...

Page 36: ...ll local and national rules Make sure that all DC switches and AC circuit breakers have been disconnected before establishing electrical connection Otherwise the high voltage within the inverter may l...

Page 37: ...adapter to the socket element stuff the sealing sleeve into the adapter and tighten the swivel nut 3 Plug the AC connector into the socket for the EPS connection Object Description Value A External d...

Page 38: ...ing conductor into the suitable terminal lug and crimp the contact 2 Align the terminal lug with the grounding conductor 3 Insert the screw through the hole located at the housing and tighten it firml...

Page 39: ...identical tilt The thresholds for the input voltage and the input current of the inverter must be adhered to see Section 10 1 Technical DC input data On the coldest day based on statistical records th...

Page 40: ...modules must be equipped with the negative DC connectors 6 7 2 Assembling the DC connectors Assemble the DC connectors as described below Be sure to observe the correct polarity The DC connectors are...

Page 41: ...s 2 Crimp the contacts with the corresponding cables Crimping tool H4TC0001 AMPHENOL 3 Insert the contact cable assembly into back of the corresponding DC plug connector A click should be heard or fel...

Page 42: ...th a DC cable having the wrong polarity the DC connector must be reassembled again The DC cable must always have the same polarity as the DC connector 5 Ensure that the open circuit voltage of the PV...

Page 43: ...Battery connection Procedure Damage to the inverter due to moisture and dust penetration Seal the unused DC inputs with sealing plugs so that moisture and dust cannot penetrate the Inverter Make sure...

Page 44: ...rough the battery terminal cover Screwdriver type T30 or SW10 torque 4 0Nm Object Description Value A External diameter 10 12mm B Copper conductor cross section 20 25mm2 C Stripping length of the cabl...

Page 45: ...quipment connection Danger to life due to electric shock when live components are touched Disconnect the inverter from all voltage sources before connect the network cable Damage to the inverter due t...

Page 46: ...he port distribution is as follows 6 9 2 BMS CAN cable connection Procedure 1 RS485 cable pin assignment as below strip the wire as shown in the figure and crimp the copper wire to the appropriate OT...

Page 47: ...rt the network cable into the corresponding communication terminal of the machine according to the arrow sequence tighten the thread sleeve and then tighten the forcing nut at the tail 6 9 3 DRED cabl...

Page 48: ...nce and insert the network cable into the RS485 communication client attached 3 Insert the network cable into the corresponding communication terminal of the machine according to the arrow sequence ti...

Page 49: ...ate OT terminal according to DIN 46228 4 provided by the customer 2 Unscrew the communication port cover cap in the following arrow sequence and insert the network cable into the RS485 communication c...

Page 50: ...them Screwdriver type PH0 torque 0 7Nm 6 9 5 WiFi connection 1 Take out the WiFi 4G modular included in the scope of delivery 2 Attach the WiFi modular to the connection port in place and tighten it i...

Page 51: ...nternet with a WLAN connection is shown as follows We offer a remote monitoring app called Solplanet You can install the Solplanet application on a smart phone using Android or an iOS operating system...

Page 52: ...t pin assignments for demand response modes as follows Pin1 DRM 1 5 Pin2 DRM 2 6 Pin3 DRM 3 7 Pin4 DRM 4 8 Pin5 RefGen Pin6 Com DRM0 Pin7 N A Pin8 N A 7 3 Earth Fault Alarm This inverter complies with...

Page 53: ...ot exceed the permitted limits Refer to the Section 2 1 Intended use about designing the PV system for the maximum allowed DC voltage Check the polarity of the DC voltage make sure the DC voltage has...

Page 54: ...ltage check that the battery voltage at the point of connection of the inverter complies with the permitted value Check the polarity of the battery voltage make sure the battery voltage has the correc...

Page 55: ...he inverter is waterproof Make sure the inverter has been correctly mounted with wall bracket Make sure the cover has been correctly mounted Make sure the communication cable and AC connector have bee...

Page 56: ...de when leaving the factory For the Australian market the inverter cannot be connected to the grid before the safety related area is set Please select from Australia Region A B C and New Zealand to co...

Page 57: ...or smart meter settings please refer to the smart meter manual 8 4 2 Initialization set up Download the Solplanet application and then you need to set the battery model working mode electricity meter...

Page 58: ...ge and cannot feed power into the grid Checking When the inverter meets the start up conditions of each mode the inverter will check feeding conditions at once If there is anything wrong during checki...

Page 59: ...Overview of the panel The inverter is equipped with five LEDs indicators Object Funct ion Diagram LED Description A SOL AR ON PV active BLINK Self check Soft upgrade OFF PV not active B BAT ON Battery...

Page 60: ...d is active and connected WHITE BLINK Grid is active Forced off grid RED ON Grid fault OFF Inverter shutdown 9 1 1 LEDs The inverter is equipped with five LED indicators white white yellow red white r...

Page 61: ...ning The red LED is lit When the inverter is faluty The ERR LED always off when the inverter is operating normally EPS LED The white LED is lit when the EPS is operating normally on load The white LED...

Page 62: ...lectric shock when touching exposed DC conductors or DC plug contacts if the DC connectors are damaged or loose The DC connectors can break or become damaged become free of the DC cables or no longer...

Page 63: ...the figure below with a dismounting wrench and pressing down firmly Make sure the DC switch is in the OFF position before operation 6 Release and disconnect the AC connector Rotate the socket element...

Page 64: ...2 Max PV array power STC 5500Wp 6180Wp 6500Wp 7500Wp 9000Wp Max input voltage 550V MPP voltage range 40V 530V Rated input voltage 380V Initial feeding in voltage 50V Min feed in power 20W Max input cu...

Page 65: ...Battery input data Type ASW300 0H S2 ASW368 0H S2 ASW400 0H S2 ASW500 0H S2 ASW600 0H S2 Nominal battery voltage 48V Battery voltage range 40V 60V Max charging power 5000W Max discharging power 5000W...

Page 66: ...rent power 3000VA 3680VA 4000VA 5000VA 6000VA Rated voltage range 220V 230V 160V 300V Rated frequency range 50 60 5Hz Max output current 13 6A 16A 18 2A 21 7A 27 3 Max output fault current 36A 36A 36A...

Page 67: ...0 0H S2 ASW500 0H S2 ASW600 0H S2 Rated active power 6000W Rated apparent power 6000VA Max apparent power 6000VA Rated voltage range 220V 230V 180V 280V Rated frequency range 50 60 5Hz Max output curr...

Page 68: ...pe ASW300 0H S2 ASW368 0H S2 ASW400 0H S2 ASW500 0H S2 ASW600 0H S2 Max output apparent power 5000VA Peak output apparent power 7500VA 10s Nominal output voltage 230V Nominal output frequency 50Hz 60H...

Page 69: ...tion indoor outdoor Mounting information wall mounting bracket DC connection technology SUNCLIX AC connection technology Plug in Connector Operating temperature range 25 60 Relative humidity non conde...

Page 70: ...ault Alarm cloud based visible AU Protection class according to IEC 62103 overvoltage category according to IEC 60664 1 I II DC III AC Internal overvoltage protection Integrated DC feed in monitoring...

Page 71: ...to the standardized power output Pac Pac r according to EN 50524 VDE 0126 13 2008 10 cl 4 5 3 Notes Values are based on rated grid voltage cos phi 1 and an ambient temperature of 25 Efficiency curve...

Page 72: ...European weighted efficiency 96 8 95 6 MPPT efficiency 99 9 Efficiency curve ASW4000H S2 80 00 85 00 90 00 95 00 100 00 0 500 1000 1500 2000 2500 3000 3500 ASW3680H S2 Efficiency 230V 400V 450V 84 00...

Page 73: ...ean weighted efficiency 96 8 96 1 MPPT efficiency 99 9 Efficiency curve ASW5000H S2 Efficiency Max efficiency European weighted efficiency 96 8 96 3 MPPT efficiency 99 9 86 00 88 00 90 00 92 00 94 00...

Page 74: ...96 8 96 4 MPPT efficiency 99 9 Discharge Efficiency curve ASW3000H S2 ASW3680H S2 ASW4000H S2 ASW5000H S2 6000H S2 88 00 90 00 92 00 94 00 96 00 98 00 0 1000 2000 3000 4000 5000 6000 7000 ASW6000H S E...

Page 75: ...r output Power reduction depends on many operating parameters including ambient temperature and input voltage grid voltage grid frequency and power available from the PV modules This device can decrea...

Page 76: ...User Manual UM0025_ASW3000 6000H S2_EN_V02_0722 75 11 9 1 Power reduction with increased ambient temperature ASW3000H S2 11 9 2 Power reduction with increased ambient temperature ASW3680H S2...

Page 77: ...76 User Manual UM0025_ASW3000 6000H S2_EN_V02_0722 11 9 3 Power reduction with increased ambient temperature ASW4000H S2 11 9 4 Power reduction with increased ambient temperature ASW5000H S2...

Page 78: ...000 6000H S2_EN_V02_0722 77 11 9 5 Power reduction with increased ambient temperature ASW6000H S2 The power reduction curve is tested at normal air pressure Different air pressure condition will cause...

Page 79: ...ection 1 6Nm Screws for connecting the inverter and wall bracket Flat head screwdriver blade with 3 5mm Sunclix DC connector Flat head screwdriver blade 0 4 2 5 Smart meter connector Stick Hand tight...

Page 80: ...power cables Multimeter Check electrical connection Marker Mark the positions of drill holes ESD glove Wear ESD glove when opening the inverter Safety goggle Wear safety goggle during drilling holes A...

Page 81: ...rings and make sure it is below the maximum DC input voltage of the inverter If the input voltage is within the permitted range and the fault still occurs it might be that the internal circuit has bro...

Page 82: ...connection on the inverter If this fault is still being shown contact the service 36 Make sure the grounding connection of the inverter is reliable Make a visual inspection of all PV cables and modul...

Page 83: ...PV array and reconnect after 3 minutes If this fault is still being shown contact the service 61 62 Check the DRED device communication or operation 65 Check if the ground line is connected with the i...

Page 84: ...ntacts of the DC switch annually Perform cleaning by cycling the switch to on and off positions 5 times The DC switch is located at the lower left of the enclosure 13 2 Cleaning the heat sink Clean th...

Page 85: ...2014 EMC Low Voltage Directive 2014 35 EU L 96 357 374 March 29 2014 LVD Radio Equipment Directive 2014 53 EU L 153 62 106 May 22 2014 RED AISWEI Technology Shanghai Co Ltd confirms herewith that the...

Page 86: ...s and conditions can be downloaded at www solplanet net if required When the customer needs warranty service during the warranty period the customer must provide a copy of the invoice factory warranty...

Page 87: ...pe Inverter serial number Type and number of connected PV modules Error code Mounting location Installation date Warranty card EMEA Service email service EMEA solplanet net APAC Service email service...

Page 88: ...User Manual UM0025_ASW3000 6000H S2_EN_V02_0722 87...

Reviews: