3-4. Quick hook – up and testing
:
For a quick hook – up of the power inverter to check its performance
before going ahead with installation, please follow these guidelines
:
3-4-1. Unpack and inspect the power inverter to check its performance
switch in the OFF position.
3-4-2. Connect the cables to the power input terminals on the rear panel of
power inverter. The red terminal is positive (+) and black terminal
is negative (-). Insert the cables into the terminals and tighten
screws to clamp the wires securely.
WARNING!
You may observe a spark when you make this
connection since current may flow to charge
capacitors in the power inverter.
Do not make this connection in the presence of
Flammable fumes. Explosion or fire may result.
WARNING!
Make sure all the DC connections are tight (torque
to 9 – 10 ft-lbs, 11.7 – 13 Nm). Loose connections
overheat and could result in a potential hazard.
10
Summary of Contents for S600 Series
Page 1: ...S600 S600R Series Pure Sine Wave Inverter User s Manual ...
Page 6: ...2 3 Mechanical Drawings P U R E S IN E W A V E IN V E R T E R 4 ...
Page 20: ...7 1 CE LVD EN60950 Declaration of Conformity 18 ...
Page 21: ...7 2 FCC Class B Declaration of Conformity 19 ...
Page 22: ...7 3 e mark e13 020866 Declaration of Conformity 20 ...
Page 23: ...7 3 e mark e13 020866 Declaration of Conformity 21 ...