19
PLASTIC PARTS
4
HARDWARE STEP 4
1. Untie the wire holding the Sleeve Spacer (24) in place on the ends of the
connecting arms (8 & 9). Align the hole in the rod ends with the hole in the
brackets of the left and right Handle Bar (10 & 11). The connector arm end
should be on the inside of the Handle Bar bracket. Secure both sides with
a Hex Head Bolt (134), Flat Washer (170) and Nylon Nut (159) by using the
Wrenches provided (184 & 187).
CONNECTING ARM
3
HARDWARE STEP 3
See Page 20 for Illustration
See Page 20 for Illustration
#170. 5/16” x 20 x 1.5T
Flat Washer (2 pcs)
#159. 5/16” x 7T
Nylon Nut (2 pcs)
#134. 5/16” x 1-1/4”
Hex Head Bolt (2 pcs)
#142. 3.5 x 12mm Sheet
Metal Screw (10 pcs)
#139. M5 x 15mm
Phillips Head Screw
(29 pcs)
#145. M6 x 10mm
Phillips Head Screw
(4 pcs)
E25 / E35 ELLIPTICAL
1. Match up the console covers (94 & 95) and secure with three Phillips head
screws (139) and two sheet metal screws (142).
2. Match up the outer Connecting Arm Covers (109 & 110) with the pre-
installed inner connecting arm covers (111 & 112). Install the outer covers
(109 & 110) onto the Left and Right Connecting Arms (8 & 9) and secure
each side with a Phillips Head Screw (139) and two Sheet Metal Screws (142).
Make sure you position the covers with the arrows pointing up. If they are
installed incorrectly, they will break.
3. Install Sliding Wheel Covers (104) on each side and secure with four Phillips
Head Screws (139).
4. Install the two Stabilizer Covers (117 and 118) on the middle stabilizer bar
with two Phillips Head Screws (139).
5. Install the Front Stabilizer Cover (103) on the front stabilizer with two Phillips
Head Screws (139).
6. Install the two incline Cover brackets (25), with the hole for mounting the
plastic cover on the bent tab facing rearward, and secure them on the Incline
Rail Assembly (2) with four Phillips Head Screws (145). Install the Rear incline
bar cover (115) on the rail base with two Screws (139).
7. Install the Rear Stabilizer Cover (116) on the Rear Stabilizer with four Phillips
Head Screws (139).
8. This step to be performed after the elliptical power is plugged in. Elevate the
incline to Level 8 and install the incline Rail front cover (113) up against the
middle stabilizer tube with four Phillips Head Screws (139).
Summary of Contents for E25
Page 10: ...8 E25 E35 ELLIPTICAL ...
Page 12: ...STEP2 10 ASSEMBLY 2 ASSEMBLY STEP1 1 E25 E35 ELLIPTICAL ...
Page 14: ...12 ASSEMBLY STEP4 4 ASSEMBLY STEP3 3 E25 E35 ELLIPTICAL ...
Page 18: ...16 E25 E35 ELLIPTICAL ...
Page 20: ...ASSEMBLY 18 STEP2 2 ASSEMBLY STEP1 1 E25 E35 ELLIPTICAL ...
Page 22: ...20 ASSEMBLY STEP4 4 ASSEMBLY STEP3 3 E25 E35 ELLIPTICAL ...
Page 36: ...EXPLODED VIEW DIAGRAM E25 34 E25 E35 ELLIPTICAL ...
Page 41: ...EXPLODED VIEW DIAGRAM E35 39 E25 E35 ELLIPTICAL ...