6 System Operation
6 1 R
the Inverter
.
un
When LED status lights display the inverter has entered
grid-connecting it means the inverter is operating well Any query
,
.
during operating the PV inverter call your dealer
,
.
NOTE
1
)
Check that device is fixed well on the wall.
Make sure all the DC breakers and AC breakers are disconnected.
2
)
)
3 AC cable is connected to grid correctly.
)
4 All PV panels are connected to inverter correctly, DC connectors which
are not used should be sealed by cover.
)
5 Turn on the external AC and DC connectors.
)
6 Turn on the DC switch to the “ON”position.
Start inverter after checking all below steps:
Start inverter
1
)
Inverter will start automatically when PV panels generate enough energy.
)
. .
2
Observe statuses of LED indicator lights on the inverter according to Table 7 2
Please set the inverter if it is the first time to start up.
Above steps are for the regular start of the inverter. If it is the first
time to start up the inverter, you need to setup the inverter.
NOTE
Power to the unit must be turned on only after installation
work
has been completed. All electrical connections must be carried
out by qualified personnel in accordance with legislation in
force in the country concerned.
WARNING
6 2 Powering OFF the Inverter
.
After the inverter powers off the remaining electricity and heat may
,
still cause electrical shock and body burns Please only begin
.
servicing the inverter ten minutes after the power-off
.
WARNING
1) Turn off the DC switch to the “OFF”position..
2) Turn off all the DC breakers and AC breakers.
3) Disconnect the external AC and DC connectors.