4 Installation
4 1 Checking the Outer Packing
.
a
When receiving the inverter check that the packing materials are intact
.
,
.
.
,
,
,
b
After unpacking check that the deliverables are complete intact and consistent with your
order list.
c
Examine the PV inverter and its fittings for damage such as scraps and cracks
.
.
Do not install the inverter on flammable building materials or in an
area that stores flammable or explosive materials
.
Do not install the inverter in a place where personnel are likely to
come into contact with its enclosure and heat sinks to avoid electrical
shock/burn
.
Figures 4 1 The deliverables: The inverter and its fittings
.
CAUTION
DANGER
The inverter
Items
Deliverables
Bolt group (including screw, nut)*3
(reserved for tighteningthe support and rear panel)
M6 screw
File package
Rear panel
A
B
C
D
E
DC terminal connector group 30K/50K(10*2)/36K/60K(12*2)
H
G
Insulated end sleeve terminals
Removal tool for DC connectors
F
G
H
If any damage mentioned above is found contact the dealer
,
immediately
.
NOTICE
12