7.6  Other connections 

External boiler request (X28) 

Potential-free relay output for switching an external boiler, for example, an external boiler 
receives a release from the SOLARFOCUS boiler control; 

 

connect to X28 on SOLARFOCUS power element. 

Attention! 

The connection is potential-free and has a maximum load of 5A. 

 

 

Fault (X29) 

Potential-free relay output, for example, to switch a warning device (optical/acoustic) upon 
occurrence of an operating fault on the boiler; 

 

connect to X29 on the power element. 

Attention! 

The connection is potential-free and has a maximum load of 5A. 

 

 

External request (X51) 

Input, i.e. the SOLARFOCUS boiler can be started by an external control; 

 

connect to X51 on the power element. 

Attention! 

This connection must be potential-free. 

 

Connect the heating circuit pump (X9, X10) 

 

Connect heating circuit pump 1 to power element connector 

X9

 and heating circuit pump 2 

to 

X10

 

If required (e.g. in the case of underfloor heating), connect a limiting thermostat. 

 

If a limiting thermostat is not used, the contact must be bridged. 

 

7.7  Internet connection 

To connect the boiler control with the Internet, connect the Ethernet port 

X2

 (type RJ45) on the back of the dis-

play with a network router via cable. The connection is required in order to use the following functions: 
-  mySOLARFOCUS app 
-  Weatherman function 
-  IP-VNC (Remote access to the boiler control) 
-  Sending e-mails 

7.8  Types of sensors - overview 

Measuring 

sleeve 

Cable 

Sensor type 

Art.No. 

Use 

Colour 

Material / finish 

Length 

15 cm 

silver 

Stainless steel braid 

3 m  PT100 

69688 

Flue gas temperature sensor (pellet

plus

, octo

plus

thermi

nator

 I) 

1.6 m  PT100 

69681 

Flue gas temperature sensor (thermi

nator

 II 22-30) 

2.1 m  PT100 

69682 

Flue gas temperature sensor (thermi

nator

 II 36-60, 

pellet

top

, pellet

plus 

1 m  PT100 

69680 

Feed sensor rotary valve (pellet

top

 , octo

plus

 ) 

13 cm 

grey 

PVC cable 

2 m  PT1000 

1622 

Flow sensor for fresh water module 

fast

 

5 cm 

red 

Silicone cable 

2.1 m  PT100 

69687 

Feed sensor pellets / wood chips feed 

red 

Silicone cable 

3 m  KTY81-110 

69686 

Return sensor, boiler temperature sensor, external 
boiler sensor 

black 

PVC cable 

3 m  KTY81-110 

69095 

Tank sensor 

 

PVC cable 

5 m  PT1000 

69095-1000  Tank sensor 

black 

PVC cable 

5 m  PT1000 

69098-1000  Flow sensor 

 

Silicone cable 

5 m  KTY81-110 

69689 

Return sensor pellet

top

 70 

2 cm 

grey 

PVC twin cable 

2 m  PT1000 

1621-PT 

Tank sensor 

white 

PVC twin cable 

2 m  KTY81-210/B 

1621 

Tank sensor 

red 

Silicone cable 

2 m  KTY81-210/B 

1620 

Collector sensor 

black 

Silicone cable 

2 m  PT1000 

1620-PT 

Collector sensor 

2 cm x 1.5 Ø 
Contact sen-

sor 

black 

PVC cable 

2 m  KTY81-110 

69098 

Flow sensor 

to be provided on-site 

KTY81-110 

69096 

External sensor; (plastic housing 66x60x39 mm) 

to be provided on-site 

PT1000 

69096-1000  External sensor; (plastic housing 66x60x39 mm) 

 

Summary of Contents for pellet top touch 35

Page 1: ...Read carefully before operating Pellet boiler pellettop touch Installation manual for qualified personnel DR 6015 EN v18 202002...

Page 2: ...rload protection 14 6 4 Return flow boosting RFB 15 7 Electrical connection 16 7 1 Connections to the boiler power element 16 7 2 Power supply for the heating system 17 7 3 EMERGENCY OFF switch 17 7 4...

Page 3: ...pproved spare parts Technical modifications to the product by the user Copyright This manual is protected by copyright Reprinting translation and reproduction of this manual in its entirety or in part...

Page 4: ...egional guidelines directives and laws pertaining to the operation of wood and pellet fired combustion systems The modification or disabling of safety equipment is strictly prohibited The fire buildin...

Page 5: ...pe diameter cm 15 15 20 20 Height flue gas pipe centre 1 D cm 46 46 59 59 Flue gas mass flow full load g s 30 37 40 55 Flue gas mass flow partial load g s 10 13 5 14 20 Max flue gas temperature full l...

Page 6: ...small parts 2 1 Ash scraper 3 1 Ash pan 4 1 Operation manual pellettop 5 1 Transparent bag with 2 x ash pan handles 4 x hinge bolt hose clamps 1 x stainless steel combustion grate 4 x adjustable feet...

Page 7: ...glow pencil 12 Stainless steel combustion grate 13 Ash container 14 Combustion chamber pellettop 49 70 1 Motors for heat exchanger clean ing 2 Lambda sensor 3 Cladding door 4 Operating unit 5 Suction...

Page 8: ...rted to the back of the boiler pellettop 49 70 in addition from the boiler top 2 x ring screws M20 1 mountable not included in the scope of delivery Fig 4 1 Fig 4 2 4 2 Removing the shipping timber pe...

Page 9: ...ontainer will be mounted on The cables for the ash extraction auger motors and the cover switch for the ash container are laid on both sides of the boiler The following procedure describes the install...

Page 10: ...2 Fig 5 5_Fitting the augers Install the ash extraction augers Insert the augers 1 Turn the augers to ensure that the bayonet lock socket at the end of the auger latches into the catch on the motor F...

Page 11: ...d as follows Unscrew the switch from the boiler Release screws at switch head 3 and turn head 180 degrees Release screws at roller lever 4 and turn head 90 degrees Replace the switch on the boiler pos...

Page 12: ...ole for emission measurement Make the hole for the emission measurement according to the following images recommendation according to standard If these specifications cannot be implemented then make t...

Page 13: ...ntent of the system l kW Boiler output kW Example 1166 litres 46 64 l kW 25 kW Overall output of heat supply German hard ness Specific water content of the system 20 l kW 50 kW 16 8 dH 50 kW to 200 kW...

Page 14: ...overload protection 4 Drain 5 Sensor for thermal overload protection Dimension of connections Technical specifications 5 6 3 Thermal overload protection Fit the thermal overload protection valve befor...

Page 15: ...oster is a guarantee condition of SOLARFOCUS During installation make sure that there is a clearance 20cm between the boiler and the return booster module to allow for subsequent replacement of pump c...

Page 16: ...Room sensor HC1 optional X42 Outside temperature sensor Boiler X4 Automatic ignition X16 Automatic ash extraction X19 ID fan X20 Overtemperature reset OTR X23 Feed motor X24 Heat exchanger cleaning X...

Page 17: ...ent covers Fig 7 2 Cable duct 1 for sensor lines on the left side of the boiler Cable duct 2 for power lines on the right side of the boiler Power element cover 3 Lower cover 4 7 5 System type Suction...

Page 18: ...use the following functions mySOLARFOCUS app Weatherman function IP VNC Remote access to the boiler control Sending e mails 7 8 Types of sensors overview Measuring sleeve Cable Sensor type Art No Use...

Page 19: ...ating Size Function F1 T 3 15 A 5x20 mm Fuse 230V AC Pre fuse main transformer F2 T 125mA 5x20 mm Fuse 230V AC Pre fuse standby transformer F3 T 10 A 5x20 mm Fuse 230V AC Relay outputs F5 F 8A 5x20 mm...

Page 20: ...ture resistance of the hose 60 C Route hose as straight as possible To avoid sagging use the SOLARFOCUS item support shell made of zinc plated sheet steel The hose must be attached to the floor at sev...

Page 21: ...lows the door to be opened when the storage area is full We recommend that you provide a means of checking the filling level of the store by eye e g by cutting small windows in the wooden boards Posit...

Page 22: ...equirements with regard to the weight load imposed by the pellets bulk weight 650 kg m The perimeter walls and the storey ceiling must meet the requirements of the respective fire resistance classes I...

Page 23: ...ny specimen firing ordinance For heating appliances with a nominal output of up to 35 kW a combustion air opening of at least 150 cm or 2 x 75 cm routed directly into the open air must be provided Alt...

Page 24: ...pellettop 9 5 Storeroom and conveying system Overview Suction system with suction heads Suction system with suction auger Suction system with suction heads and sloping floor Pellet box with suction sy...

Page 25: ...Annex Installation manual pellettop 25 Boiler cascade solution with different storage conveying system...

Page 26: ...Annex 26 Installation manual pellettop 9 6 Commissioning log...

Page 27: ...Annex Installation manual pellettop 27...

Page 28: ...Annex 28 Installation manual pellettop 9 7 Customer service order form...

Page 29: ...Annex Installation manual pellettop 29...

Page 30: ...Annex 30 Installation manual pellettop...

Page 31: ...Annex Installation manual pellettop 31...

Page 32: ...products that take the strain off the envi ronment and your wallet Everything from a single source Biomass heating Solar systems Heat pumps Fresh water equipment Tested leading edge technology EN ISO...

Reviews: