Electrical connection
Installation manual
pellet
top
17
7.2 Power supply for the heating system
A separate power circuit is to be provided in the boiler room / boiler installation room for the heating
system.
Mains connection: 230 V AC / 50 Hz C13 A; Specification for the mains connection cable (e.g. in case
of replacement): cable SIHF-J 3x1.5 mm²
7.3 EMERGENCY OFF switch
An
"Emergency OFF"
switch must be fitted outside the boiler room
– near the boiler room / boiler
installation room
; observe regional building regulations.
7.4 Cable management, covers
Fig. 7-2
- Cable duct
1
for sensor lines on the left
side of the boiler.
- Cable duct
2
for power lines on the right
side of the boiler.
- Power element cover
3
- Lower cover
4
7.5 System type: Suction system with suction auger
SOLARFOCUS system
5-pin connector, di-
rect extraction motor
Connection
X14
on the power
element
PE
PE
N
N
L3
L
L2
TC
L1
TC
Route cable (5x1.5 mm², to be provided on site) from connection cable of the direct extraction motor to the
power element.
Third-party manufacturer system (motor thermal protection integrated)
Route a cable (3x1.5 mm²) from the direct extraction motor to the boiler power
element.
Bridge the two TC terminals on the power element.
Applies e.g. to: Pellet box transfer unit screw; Pellet mole
Summary of Contents for pellet top touch 35
Page 26: ...Annex 26 Installation manual pellettop 9 6 Commissioning log...
Page 27: ...Annex Installation manual pellettop 27...
Page 28: ...Annex 28 Installation manual pellettop 9 7 Customer service order form...
Page 29: ...Annex Installation manual pellettop 29...
Page 30: ...Annex 30 Installation manual pellettop...