To check Backup:
1. Disconnect the AC power by shutting off the AC at the main distribution panel. The inverter should
disconnect from the grid, and continue supplying power to the backed-up loads.
Switching to Backup mode takes a few seconds. The LCD screen will show tha Backup mode is ON:
V a c [ V ] V d c [ V ] P a c [ W ]
2 4 0 . 7 3 7 1 . 9 2 3 4 9 . 3
P _ O K : X X X / Y Y Y < S _ O K >
B a c k u p M o d e O N
2. Press the external LCD light button to display the battery status screen, and check that:
l
The battery State is: Discharging / Charging
l
The SOE percentage is decreasing/increasing
l
The PWR value is greater than 0
B S N : X X X X X X X X X I D : 2 4
S O E : 8 9 %
W W W W W
P W R : 3 W
T o t a l : < x > W h
S t a t e : D i s c h a r g i n g
3. Turn the AC back ON from the main distribution panel. The inverter should reconnect loads back to
the grid.
To check Maximize Self-consumption mode:
1. Verify the inverter ON/OFF switch is ON.
2. Turn on as many loads so that consumption is greater than the inverter's maximum AC power.
3. Press the inverter LCD light button to display the Meter status screen and check that import power is
greater than zero:
I m p o r t M e t e r
S t a t u s : < O K / E r r o r # >
P o w e r [ W ] : x x x x x . x
E n e r g y [ W h ] : X X X X X . X
4. Press the inverter LCD light button to display the Smart Energy Management and the Battery status
screens, and check that:
o
State
= Discharging (assuming consumption > PV production ; inverter maximum AC power > PV
production.
o
PWR
> 0
B S N : X X X X X X X X X I D : 2 4
S O E : 8 9 %
W W W W W
P W R : 2 W
T o t a l : < X > W h
S t a t e : D i s c h a r g i n g
Chapter 10: System Configuration
SolarEdge
-
StorEdge Installation Guide MAN-01-00262-1.3
91