5. To set up the level of charging from AC, do the following:
a. Select
Energy Manager
è
Storage Control
. The following is displayed:
B a c k u p R s v d < N / A >
A C C h a r g e L i < N o n e >
b. Select
AC Charge Li
è
Limit Type
, and set one of the following limits:
l
Set
%PV
to enter a limit as a percentage of year-to-date energy production.
l
Set
kWh
to enter a fixed annual energy limit.
l
Set
None
to unlimit the charging.
6. To set a minimum battery level used for backup, so that the battery will always have energy stored in
case backup power is needed, select
Backup Rsvd
and set the required level of reserved energy as
percentage of the battery capacity
o
For backup power + Smart Energy Management - according to user requirement
o
For backup-only - according to battery manufacturer recommendation, if provided.
Verifying StorEdge Components Functionality
Upon installation and configuration completion, the system should be operating according to the
selected StorEdge application.
This section describes how to verify that all system components are functioning as expected. If not, refer
to
To check the meter and inverter:
1. Verify that AC is ON.
2. Check the meter (installed in export or consumption position, CT arrows point to the grid):
a. Turn the inverter ON/OFF switch to OFF.
b. Connect loads on one of the measured phases.
c. Press the external LCD light button to display the Import or Consumption meter status screen,
and check that the import or consumption energy (Energy[Wh]) is greater than 0 (may take a few
minutes, depending on the loads size):
I m p o r t M e t e r
S t a t u s : < O K / E r r o r # >
P o w e r [ W ] : x x x x x . x
E n e r g y [ W h ] : X X X X X . X
d. Press the LCD light button to display the Export meter status screen, and check that the Export
power is equal to zero. If it is not zero, check the CT direction on all connected phases.
3. Turn the inverter ON/OFF switch to ON.
4. Turn the Connection Unit switch to ON.
5. While the modules are exposed to sunlight (PV system is connected to the grid and the inverter is
producing power), press the inverter LCD light button to display the power status screen, and check
that the grid AC output (Vac) increases to 220-240V, and the total AC output power produced (Pac):
V a c [ V ] V d c [ V ] P a c [ W ]
2 4 0 . 7
w
3 7 1 . 9
2 3 4 9 . 3
P _ O K : X X X / Y Y Y < S _ O K >
. . . . . . . . . . . . . . . . .
O N
SolarEdge
-
StorEdge Installation Guide MAN-01-00262-1.3
90
Verifying StorEdge Components Functionality