Fuse Replacement
Replacement kits are available from SolarEdge or you can use other fuses with identical ratings.
1. Turn OFF the inverter ON/OFF switch, and wait until the LCD indicates that the DC voltage is safe
(<50V), or wait five minutes before continuing to the next step.
WARNING!
If you cannot see the inverter panel, or if a malfunction is indicated on the LCD panel, wait five
minutes for the input capacitors of the inverter to discharge.
Si vous ne pouvez pas voir l'écran de l'onduleur ou si un dysfonctionnement est indiqué sur l'écran
LCD, attendez cinq minutes pour que les condensateurs d'entrée de l'onduleur soient déchargés.
2. Turn OFF the Connection Unit and the AC switch of the distribution panel.
3. Open and remove the Connection Unit cover.
4. For Connection Unit - Open and remove the internal transparent cover.
5. Remove the faulty fuse from the upper board of the Connection Unit and replace with a new fuse.
6. Close the Connection Unit cover(s).
Figure 48: Connection Unit fuses
Battery Replacement
To disconnect or replace a battery:
1. Turn OFF the Connection Unit ON/OFF switch.
2. Turn OFF the inverter ON/OFF switch, and wait until the LCD indicates that the DC voltage is safe
(<50V), or wait five minutes before continuing to the next step.
WARNING!
If you cannot see the inverter panel, or if a malfunction is indicated on the LCD panel, wait five
minutes for the input capacitors of the inverter to discharge.
Si vous ne pouvez pas voir l'écran de l'onduleur ou si un dysfonctionnement est indiqué sur l'écran
LCD, attendez cinq minutes pour que les condensateurs d'entrée de l'onduleur soient déchargés.
3. Turn OFF the AC switch at the distribution panel.