Chapter 9: Setting Up Communication to the
Monitoring Platform
Power optimizers send information to the inverter via the DC power lines (the PV output circuit). The
information is sent from the inverter to the SolarEdge monitoring platform through the Internet. In
order to send the data from the inverter, a communication connection must be set up, as described in
this chapter.
CAUTION!
When connecting the communication cables, make sure that the ON/OFF switch at the bottom
of the inverter is turned OFF, and the AC is turned OFF.
When configuring the communication parameters, make sure that the ON/OFF switch is OFF,
and the AC is turned ON.
Lors de la connexion des câbles de communication, assurez-vous que l'interrupteur
MARCHE/ARRÊT à la base de l'onduleur soit en position ARRÊT, et le CA est en position
ARRÊT. Lors de la configuration des paramètres de communication, assurez-vous que
l'interrupteur MARCHE/ARRÊT soit en position ARRÊT, et le CA est en position MARCHE.
SolarEdge
-
StorEdge Installation Guide MAN-01-00262-1.3
72
Chapter 9: Setting Up Communication to the Monitoring Platform