To check the correct connection of the power optimizers:
1
Measuring the voltage of each string individually before their connection to other
1
Measuring the voltage of each string individually before their connection to other
chains or the inverter. Verify the correct polarity by measuring the polarity of the channel using a voltmeter.
Use a multimeter with a measuring accuracy of at least 0.1 V.