To connect to the monitoring platform:
1. Designate a single inverter as the connection point between the RS485 bus and the
monitoring platform. This inverter will serve as the master inverter.
2. Connect the master to the monitoring platform via the LAN option (refer to ) or any
of the other options.
To configure the RS485 bus:
All inverters are configured by default as slaves. To configure the master:
1. Verify the ON/OFF/P switch is OFF.
2. Verify that AC is on.
3. Use SetApp to access the
Commissioning
menu screen as described in
4. From the
Commissioning
menu tap
Communication
. The Communication screen is
displayed.
5. Select the following to configure the connection:
Server
è
LAN, Cellular or Wi-Fi
RS485-
è
Protocol
è
SolarEdge
è
SolarEdge Master
RS485-
è
Slave Detect
The system starts automatic detection of the slave inverters connected to the master
inverter. The inverter should report the correct number of slaves. If it does not, verify
the connections and terminations.
6. To check the slave IDs and last communication time, select
RS485
è
Slave List
.
7. Verify the connection of the master to the monitoring platform, as described in the
next section.
Verifying the Connection
After connecting and configuring a communication option, perform the following
steps to check that the connection to the monitoring server has been successfully
established.