![SolarEdge L20-IB60, L20-IB00 Installation Manual Download Page 46](http://html1.mh-extra.com/html/solaredge/l20-ib60-l20-ib00/l20-ib60-l20-ib00_installation-manual_1313774046.webp)
38
L20, L30
5.12.
Computer access
1.
One end of a USB cable connects to the computer, the other end connects to the USB
port on the UPS.
2.
Open the software Muser5000, click “system” button.
Figure 30 Muser5000 homepage
3.
Software Parameter Setting window opens, choose COM according to the UPS model,
choose 9600 for baud rate, choose modbus for protocol, then save this setting.
Figure 31 Muser5000 communication setting page
Summary of Contents for L20-IB60, L20-IB00
Page 2: ......
Page 17: ...9 L20 L30 Figure 5 Install covers...
Page 27: ...19 L20 L30 5 5 Cabinet view Figure 15 Front view Side view of L20 and L30...
Page 31: ...23 L20 L30 5 7 Electrical Diagrams Figure 19 Remote EPO NO and NC port...
Page 32: ...24 L20 L30 Figure 20 External maintenance bypass auxiliary contacts...