![SolarEdge L20-IB60, L20-IB00 Installation Manual Download Page 25](http://html1.mh-extra.com/html/solaredge/l20-ib60-l20-ib00/l20-ib60-l20-ib00_installation-manual_1313774025.webp)
17
L20, L30
5.4.
Unpacking and first check
1.
Do not tilt the UPS when moving it out from the packaging.
2.
Check the appearance to see if the UPS is damaged or not during the transportation, do
not switch on the UPS if any damage found, please contact
SolarEdge Critical Power
support.
3.
Check the accessories according to the packing list.
4.
Cut off the banding.
Figure 10 cut off the bandage
5.
Remove the cabinet outer package.
Figure 11 Remove the package
6.
Remove the cabinet inner package, unfasten the screws, and remove the fixed wooden
bar to the cabinet.
Summary of Contents for L20-IB60, L20-IB00
Page 2: ......
Page 17: ...9 L20 L30 Figure 5 Install covers...
Page 27: ...19 L20 L30 5 5 Cabinet view Figure 15 Front view Side view of L20 and L30...
Page 31: ...23 L20 L30 5 7 Electrical Diagrams Figure 19 Remote EPO NO and NC port...
Page 32: ...24 L20 L30 Figure 20 External maintenance bypass auxiliary contacts...