Do not use extension cables between a module and a power optimizer, between two
modules connected to the same power optimizer, or between two power optimizers
other than in the following cases:
Between a power optimizer and a module:
Power optimizers with the 4-type suffix in their part number (Pxxx-4xxxxxx) -
extension cables of up to 16 m can be installed per power optimizer (8 m for DC+
and 8 m for DC-).
Power optimizers manufactured starting from working week 42, 2019, as
indicated in the serial number (Example: S/N SJ5019A-xxxxxxxx - working week
50, 2019) - extension cables of up to 16 m can be installed per power optimizer (8
m for DC+ and 8 m for DC-).
Between two power optimizers or between a power optimizer and the inverter:
Extension cables can be installed between power optimizers only from row to
row, around obstacles or pathways within a row, and from the end of the string
to the inverter, as long as the total cable length is not exceeded.
For connecting power optimizers to the inverter, use cables with a minimum cross-
section of 11 AWG/ 4 mm² DC cables.
Frame-mounted power optimizers are mounted directly on the module
frame, regardless of racking system (rail-less or with rails). For
installation of frame-mounted power optimizers, refer to
http://www.solaredge.com/sites/default/files/installing_frame_
.
The steps in this chapter refer to module add-on power optimizers. For smart
modules, start from
Step 3: Connecting Power Optimizers in Strings on page 17. Also
refer to the documentation supplied with the smart modules.
The power optimizer can be placed in any orientation.
If connecting more modules than power optimizer inputs in parallel, use a branch
cable. Some commercial power optimizer models have a dual input.
Position the power optimizer close enough to its module so that their cables can be
connected.
Make sure to use power optimizers that have the required output conductor length.
Completely shaded modules may cause their power optimizers to temporarily shut
down. This will not affect the performance of the other power optimizers in the
string, as long as the minimum number of unshaded power optimizers connected in
a string of modules is met. If under typical conditions fewer than the minimum
Three Phase System MAN-01-00505-1.5
14
Installation Guidelines
Summary of Contents for Delta E30K-RW00IBNJ4
Page 84: ......