December 2020
|
Solar Stik
®
, Inc.
88
|
System Setup and Operation Manual for the Solar Stik G-BOSS E Light HPS
PRELIMINARY
Item #
Item to be
Inspected
Interval
Procedures
Non-mission Capable
1
Visual
inspection of
PDM 3000
M
1. Inspect case for visible damage
and missing items.
2. Clean excessive dust or dirt
accumulation from the exterior,
interior and connectors.
3. Close all unused port covers.
~If the case is broken or split or
if connectors are damaged, do
not place into service.
~Clean any dirt or debris that
has accumulated in the cutouts
on the bottom.
Table 16. PDM 3000 PMCS
PDM 3000 PMCS
Figure 53. PDM 3000 bottom side
The PDM 3000 case is sealed. No maintenance of internal parts is required or advised.